IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0643 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $36,000 $384 Not Implemented
OK0643 # 06 Y:2002 06 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $117,500 $4,800 Implemented
OK0643 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,970 $300 Implemented
OK0644 # 01 Y:2002 01 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $190 $280 Not Implemented
OK0644 # 02 Y:2002 02 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $570 $3 Implemented
OK0644 # 03 Y:2002 03 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,441 $1,738 Implemented
OK0644 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,779 $5,835 Not Implemented
OK0644 # 05 Y:2002 05 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $223,374 $103,500 Not Implemented
AS0334 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,317 $0 Not Implemented
AS0334 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,247 $312 Not Implemented
AS0334 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $667 $1,350 Not Implemented
AS0334 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $424 $441 Not Implemented
AS0334 # 05 Y:2002 05 2002 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $32,221 $12,000 Not Implemented
AS0334 # 06 Y:2002 06 2002 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $3,596 $60 Not Implemented
AS0334 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,710 $5,232 Not Implemented
AS0334 # 08 Y:2002 08 2002 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,926 $85 Not Implemented
AS0334 # 09 Y:2002 09 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,865 $8,955 Not Implemented
AS0334 # 10 Y:2002 10 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $379 $546 Not Implemented
SU0140 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $593,735 $5,128,500 Not Implemented
SU0140 # 02 Y:2002 02 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $392,475 $730,000 Not Implemented
SU0140 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $147,968 $19,500 Not Implemented
SU0140 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,283 $64,018 Implemented
SU0140 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,631 $14,250 Implemented
SU0140 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,122 $700 Implemented
SU0140 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,142 $360 Not Implemented