IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94,135

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0292 # 24 Y:2004 24 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,935 $5,740 Not Implemented
WV0292 # 25 Y:2004 25 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,929 $3,460 Not Implemented
WV0292 # 26 Y:2004 26 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,494 $4,715 Implemented
WV0292 # 27 Y:2004 27 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,007 $1,000 Implemented
WV0292 # 28 Y:2004 28 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,659 $2,088 Not Implemented
WV0292 # 29 Y:2004 29 2004 INSTALL OCCUPANCY SENSORS $1,497 $1,944 Not Implemented
UU0067 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $25,126 $0 Implemented
UU0067 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,160 $200 Not Implemented
UU0067 # 03 Y:2004 03 2004 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $495 $400 Not Implemented
UU0067 # 04 Y:2004 04 2004 INSTALL WIND POWERED ELECTRIC GENERATOR $0 $0 Implemented
UU0067 # 05 Y:2004 05 2004 INSTALL WIND POWERED ELECTRIC GENERATOR $0 $40,000 Not Implemented
UU0067 # 06 Y:2004 06 2004 TREAT AND REUSE RINSE WATERS $635,880 $1,705,000 Not Implemented
SD0348 # 01 Y:2004 01 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,921 $12,655 Not Implemented
SD0348 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,682 $2,600 Not Implemented
SD0348 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,371 $747 Not Implemented
SD0348 # 04 Y:2004 04 2004 USE PHOTOCELL CONTROLS $1,538 $1,720 Not Implemented
SD0348 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,553 $18,500 Not Implemented
SD0348 # 06 Y:2004 06 2004 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $70,166 $43,083 Not Implemented
SD0348 # 07 Y:2004 07 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $2,935 $3,500 Not Implemented
SU0194 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $662 $0 Implemented
SU0194 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $734 $11 Implemented
SU0194 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,623 $1,616 Implemented
SU0194 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,404 $868 Implemented
SU0194 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,484 $576 Implemented
SU0194 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $154 Implemented