Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,315
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0455 # 02 Y:2010 | 02 | 2010 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,026 | $620 | Not Implemented |
IA0455 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $562 | $14 | Implemented |
IA0455 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,132 | $14 | Not Implemented |
IA0455 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,112 | $240 | Implemented |
IA0455 # 06 Y:2010 | 06 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,817 | $3,837 | Not Implemented |
IA0455 # 07 Y:2010 | 07 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $165 | $112 | Implemented |
IA0455 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $6,632 | $9,702 | Implemented |
IA0455 # 09 Y:2010 | 09 | 2010 | INSTALL OCCUPANCY SENSORS | $1,331 | $3,960 | Implemented |
IA0455 # 10 Y:2010 | 10 | 2010 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $28,440 | $1,320 | Not Implemented |
IA0455 # 11 Y:2010 | 11 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,067 | $2,556 | Not Implemented |
IA0455 # 12 Y:2010 | 12 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,138 | $4,417 | Implemented |
IA0449 # 01 Y:2010 | 01 | 2010 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $13,384 | $500 | Not Implemented |
IA0449 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,171 | $500 | Implemented |
IA0449 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,181 | $650 | Implemented |
IA0449 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,025 | $28,980 | Implemented |
IA0449 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $229 | $1,199 | Implemented |
IA0449 # 06 Y:2010 | 06 | 2010 | INSULATE BARE EQUIPMENT | $5,734 | $1,910 | Implemented |
IA0449 # 07 Y:2010 | 07 | 2010 | COVER OPEN TANKS | $8,215 | $6,350 | Not Implemented |
IA0448 # 01 Y:2010 | 01 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,064 | $560 | Implemented |
IA0448 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,840 | $1,000 | Implemented |
IA0448 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,986 | $50 | Not Implemented |
IA0448 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,736 | $1,440 | Implemented |
IA0448 # 05 Y:2010 | 05 | 2010 | REDUCE VENTILATION AIR | $1,274 | $2,000 | Not Implemented |
IA0448 # 06 Y:2010 | 06 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $2,798 | $800 | Implemented |
IA0448 # 07 Y:2010 | 07 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $371 | $1,000 | Not Implemented |