IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,433

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0364 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,080 $1,210 Not Implemented
IA0364 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $6,174 Not Implemented
IA0364 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $6,744 Not Implemented
IA0364 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,547 $8,960 Not Implemented
IA0364 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,078 $900 Not Implemented
IA0364 # 06 Y:2005 06 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,250 $1,800 Not Implemented
IA0364 # 07 Y:2005 07 2005 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $37,500 $15,000 Not Implemented
IA0364 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,562 $425 Not Implemented
IA0364 # 09 Y:2005 09 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,040 $640 Not Implemented
IA0364 # 10 Y:2005 10 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,250 $650 Not Implemented
IA0364 # 11 Y:2005 11 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $18,149 $1,500 Not Implemented
IA0364 # 12 Y:2005 12 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,870 $1,000 Not Implemented
IA0364 # 13 Y:2005 13 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $31,486 $50,000 Not Implemented
IA0364 # 14 Y:2005 14 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $106,060 $8,250 Not Implemented
IA0365 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,317 $50 Implemented
IA0365 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $19 Implemented
IA0365 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,995 $3,000 Implemented
IA0365 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $1,148 $1,001 Not Implemented
IA0365 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $628 $1,600 Implemented
IA0365 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $1,000,000 $152,672 Implemented
IA0365 # 07 Y:2005 07 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,495 $14,000 Not Implemented
IA0365 # 08 Y:2005 08 2005 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $21,000 $7,216 Implemented
IA0337 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,090 $1,131 Implemented
IA0337 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,097 $757 Implemented
IA0337 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $151 $16 Not Implemented