Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0030 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,145 | $7,000 | Implemented |
TR0030 # 04 Y:2022 | 04 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,744 | $7,758 | Implemented |
TR0029 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,939 | $24,345 | Implemented |
TR0029 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $5,000 | Implemented |
TR0029 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,707 | $2,500 | Not Implemented |
AM0863 # 01 Y:2023 | 01 | 2023 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $26,790 | $0 | Implemented |
AM0863 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $11,860 | $23,400 | Implemented |
AM0863 # 03 Y:2023 | 03 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $56,316 | $5,000 | Implemented |
AM0863 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $1,005 | $630 | Not Implemented |
AM0863 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $830 | $38 | Not Implemented |
AM0863 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $640 | $1,235 | Implemented |
AM0863 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $351 | $0 | Implemented |
AM0862 # 01 Y:2023 | 01 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $80,175 | $8,170 | Implemented |
AM0862 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $27,516 | $41,926 | Implemented |
AM0862 # 03 Y:2023 | 03 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $18,325 | $6,300 | Implemented |
AM0862 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,300 | $9,000 | Not Implemented |
AM0862 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,080 | $16,563 | Implemented |
AM0862 # 06 Y:2023 | 06 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,203 | $4,750 | Implemented |
AM0861 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $238,650 | $7,000 | Implemented |
AM0861 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,100 | $9,940 | Implemented |
AM0861 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $18,300 | $41,680 | Not Implemented |
AM0861 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,960 | $460 | Implemented |
AM0861 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,870 | $13 | Implemented |
AM0861 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $700 | $0 | Implemented |
AM0861 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $101 | $214 | Not Implemented |