IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0107 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,590 $2,085 Not Implemented
UU0107 # 04 Y:2006 04 2006 REPLACE BOILER $1,090 $800 Not Implemented
UU0107 # 05 Y:2006 05 2006 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,470 $8,820 Not Implemented
UU0107 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $1,690 $1,860 Not Implemented
OR0504 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $64,300 $20,000 Implemented
OR0504 # 02 Y:2006 02 2006 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $22,500 $44,500 Implemented
OR0504 # 03 Y:2006 03 2006 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $84,100 $0 Not Implemented
OR0504 # 04 Y:2006 04 2006 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $28,000 $0 Not Implemented
OR0504 # 05 Y:2006 05 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $23,000 $0 Implemented
OR0504 # 06 Y:2006 06 2006 REDESIGN PROCESS $6,100 $5,000 Not Implemented
OR0504 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,500 $1,000 Not Implemented
OR0506 # 01 Y:2006 01 2006 ADD ADDITIONAL PRODUCTION SHIFT $360,000 $2,100 Implemented
OR0506 # 02 Y:2006 02 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $9,000 $2,100 Implemented
OR0506 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,000 $0 Implemented
OR0506 # 04 Y:2006 04 2006 ADD ADDITIONAL PRODUCTION SHIFT $11,400 $2,700 Implemented
OR0506 # 05 Y:2006 05 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $3,600 Implemented
OR0506 # 06 Y:2006 06 2006 PAY BILLS ON TIME TO AVOID LATE FEES $2,300 $0 Implemented
LE0247 # 01 Y:2006 01 2006 REPLACE BOILER $115,080 $223,000 Not Implemented
LE0247 # 02 Y:2006 02 2006 REVISE RAW MATERIAL SPECS $106,250 $60,000 Not Implemented
LE0247 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $26,312 $16,000 Not Implemented
LE0247 # 04 Y:2006 04 2006 ADOPT IN-HOUSE MATERIAL GENERATION $24,012 $20,000 Implemented
LE0247 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,245 $15,000 Not Implemented
LE0247 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,646 $2,500 Implemented
LE0247 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,225 $1,152 Implemented
LE0247 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $1,181 $300 Not Implemented