Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0574 # 04 Y:2021 | 04 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $96,904 | $419,477 | Implemented |
SF0574 # 05 Y:2021 | 05 | 2021 | REDUCE DELIVERY SCHEDULES | $19,915 | $56,589 | Implemented |
UF0569 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,828 | $23,023 | Implemented |
UF0569 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,925 | $25,340 | Not Implemented |
UF0569 # 03 Y:2021 | 03 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $16,113 | $14,830 | Not Implemented |
UF0569 # 04 Y:2021 | 04 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,766 | $5,229 | Implemented |
UF0569 # 05 Y:2021 | 05 | 2021 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $11,660 | $40,000 | Not Implemented |
UF0569 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,252 | $1,985 | Implemented |
UF0569 # 07 Y:2021 | 07 | 2021 | USE OPTIMUM TEMPERATURE | $3,887 | $0 | Implemented |
UF0569 # 08 Y:2021 | 08 | 2021 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $3,742 | $3,746 | Not Implemented |
UF0569 # 09 Y:2021 | 09 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,071 | $495 | Implemented |
UF0569 # 10 Y:2021 | 10 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,868 | $0 | Implemented |
UF0569 # 11 Y:2021 | 11 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,822 | $0 | Implemented |
TT0258 # 01 Y:2021 | 01 | 2021 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $65,709 | $230,400 | Not Implemented |
TT0258 # 02 Y:2021 | 02 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,627 | $25,000 | Not Implemented |
TT0258 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,751 | $37,500 | Not Implemented |
TT0258 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,652 | $4,000 | Not Implemented |
TT0258 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,092 | $10,000 | Not Implemented |
TT0258 # 06 Y:2021 | 06 | 2021 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,703 | $7,500 | Not Implemented |
TT0258 # 07 Y:2021 | 07 | 2021 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $1,108 | $5,000 | Not Implemented |
TT0258 # 08 Y:2021 | 08 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $445 | $0 | Not Implemented |
OK1053 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $11,834 | $16,500 | Not Implemented |
OK1053 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,462 | $16,440 | Implemented |
OK1053 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,980 | $0 | Implemented |
OK1053 # 04 Y:2021 | 04 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,785 | $1,966 | Not Implemented |