IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,920

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0631 # 10 Y:2001 10 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $904 $0 Not Implemented
UD0631 # 11 Y:2001 11 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $797 $1,168 Not Implemented
UD0631 # 12 Y:2001 12 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $534 $680 Not Implemented
UD0631 # 13 Y:2001 13 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $421 $688 Implemented
UD0630 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,607 $720 Implemented
UD0630 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $11,232 $5,000 Implemented
UD0630 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,449 $560 Implemented
UD0630 # 04 Y:2001 04 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $3,432 $700 Not Implemented
UD0630 # 05 Y:2001 05 2001 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,639 $500 Implemented
UD0630 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,272 $88 Implemented
UD0630 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $611 $1,180 Implemented
UD0630 # 08 Y:2001 08 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $300 $0 Not Implemented
UD0629 # 01 Y:2001 01 2001 MOVE PRODUCT USING MECHANICAL MEANS $21,879 $25,000 Not Implemented
UD0629 # 02 Y:2001 02 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $18,079 $15,000 n/a
UD0629 # 03 Y:2001 03 2001 REDUCE SCRAP PRODUCTION $15,862 $6,000 Not Implemented
UD0629 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,324 $0 Not Implemented
UD0629 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $5,835 $1,760 Not Implemented
UD0629 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,200 $1,500 Not Implemented
UD0629 # 07 Y:2001 07 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,907 $0 Implemented
UD0629 # 08 Y:2001 08 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,128 $0 Not Implemented
UD0629 # 09 Y:2001 09 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $982 $250 Not Implemented
UD0629 # 10 Y:2001 10 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $628 $300 Not Implemented
UD0628 # 01 Y:2001 01 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $35,895 $7,000 Not Implemented
UD0628 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,711 $55,200 Not Implemented
UD0628 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $17,969 $9,000 Implemented