IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,853

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0236 # 05 Y:2002 05 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,418 $5,500 Implemented
SF0236 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $5,507 $11,580 Not Implemented
SF0236 # 07 Y:2002 07 2002 REDUCE FLUID FLOW RATES $10,895 $20,460 Not Implemented
SF0236 # 08 Y:2002 08 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,503 $13,784 Not Implemented
SF0236 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,365 $30,620 n/a
LM0034 # 01 Y:2002 01 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $20,645 $300 Implemented
LM0034 # 02 Y:2002 02 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,353 $1,480 Not Implemented
LM0034 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,937 $200 Not Implemented
LM0034 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,911 $0 Implemented
LM0034 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,006 $2,640 Implemented
LM0034 # 06 Y:2002 06 2002 USE OPTIMUM THICKNESS INSULATION $6,347 $900 Not Implemented
SD0294 # 01 Y:2002 01 2002 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,512 $6,000 Not Implemented
SD0294 # 02 Y:2002 02 2002 ISOLATE HOT OR COLD EQUIPMENT $3,123 $5,200 Not Implemented
SD0294 # 03 Y:2002 03 2002 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,969 $2,000 Not Implemented
SD0294 # 04 Y:2002 04 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $501 $20 Not Implemented
SD0294 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,904 $2,000 Implemented
SF0235 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $300 Implemented
SF0235 # 02 Y:2002 02 2002 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $5,997 $206 Not Implemented
SF0235 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,612 $3,553 Implemented
SF0235 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $298,248 $112,368 n/a
SF0235 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,228 $2,805 Implemented
SF0235 # 06 Y:2002 06 2002 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $4,004 $2,461 Not Implemented
SF0235 # 07 Y:2002 07 2002 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $9,286 $6,700 Not Implemented
SF0235 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,822 $26,538 Not Implemented
SF0235 # 09 Y:2002 09 2002 REDUCE FLUID FLOW RATES $3,202 $3,675 Not Implemented