IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,704

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0063 # 01 Y:1996 01 1996 INSTALL OCCUPANCY SENSORS $9,836 $5,400 Implemented
BD0063 # 02 Y:1996 02 1996 COMBINE UTILITY METERS $5,724 $100 Not Implemented
BD0063 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,541 $8,390 Implemented
BD0063 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,677 $750 Implemented
BD0063 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $833 $600 Not Implemented
BD0063 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $421 $903 Not Implemented
BD0063 # 07 Y:1996 07 1996 MINIMIZE WATER USAGE $1,090 $1,395 Not Implemented
BD0062 # 01 Y:1996 01 1996 INSTALL OCCUPANCY SENSORS $2,266 $2,400 Not Implemented
BD0062 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,507 $2,846 Not Implemented
BD0062 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $552 $600 Not Implemented
BD0062 # 04 Y:1996 04 1996 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $509 $80 Not Implemented
BD0062 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $299 $388 Not Implemented
BD0062 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $336 $500 Not Implemented
BD0062 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $450 Not Implemented
BD0062 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,821 $7,500 Not Implemented
BD0062 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $1,016 $2,275 Not Implemented
BD0062 # 10 Y:1996 10 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $881 $2,245 Not Implemented
WI0275 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,083 $1,400 Not Implemented
WI0275 # 02 Y:1996 02 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,633 $14,000 Not Implemented
WI0275 # 03 Y:1996 03 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,271 $3,200 Not Implemented
WI0275 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $588 $450 Not Implemented
WI0275 # 05 Y:1996 05 1996 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,984 $0 Not Implemented
WI0275 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,750 $3,184 Not Implemented
WI0275 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $1,013 $600 Implemented
WI0275 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $591 Not Implemented