Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,990
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0630 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,232 | $5,000 | Implemented |
UD0630 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,449 | $560 | Implemented |
UD0630 # 04 Y:2001 | 04 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $3,432 | $700 | Not Implemented |
UD0630 # 05 Y:2001 | 05 | 2001 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,639 | $500 | Implemented |
UD0630 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,272 | $88 | Implemented |
UD0630 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $611 | $1,180 | Implemented |
UD0630 # 08 Y:2001 | 08 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $300 | $0 | Not Implemented |
UD0629 # 01 Y:2001 | 01 | 2001 | MOVE PRODUCT USING MECHANICAL MEANS | $21,879 | $25,000 | Not Implemented |
UD0629 # 02 Y:2001 | 02 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $18,079 | $15,000 | n/a |
UD0629 # 03 Y:2001 | 03 | 2001 | REDUCE SCRAP PRODUCTION | $15,862 | $6,000 | Not Implemented |
UD0629 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,324 | $0 | Not Implemented |
UD0629 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $5,835 | $1,760 | Not Implemented |
UD0629 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,200 | $1,500 | Not Implemented |
UD0629 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,907 | $0 | Implemented |
UD0629 # 08 Y:2001 | 08 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,128 | $0 | Not Implemented |
UD0629 # 09 Y:2001 | 09 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $982 | $250 | Not Implemented |
UD0629 # 10 Y:2001 | 10 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $628 | $300 | Not Implemented |
UD0628 # 01 Y:2001 | 01 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $35,895 | $7,000 | Not Implemented |
UD0628 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,711 | $55,200 | Not Implemented |
UD0628 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $17,969 | $9,000 | Implemented |
UD0628 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,246 | $15,500 | Not Implemented |
UD0628 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $11,223 | $7,600 | Implemented |
UD0628 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,414 | $33,000 | Not Implemented |
UD0628 # 07 Y:2001 | 07 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,858 | $0 | Implemented |
UD0628 # 08 Y:2001 | 08 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,827 | $4,000 | Not Implemented |