Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0149 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,234 | $116,200 | Implemented |
UF0149 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,019 | $1,350 | Implemented |
UF0149 # 06 Y:1996 | 06 | 1996 | BURN WASTE OIL FOR HEAT | $2,278 | $0 | Not Implemented |
UF0149 # 07 Y:1996 | 07 | 1996 | ELIMINATE/REDUCE AN OPERATION | $10,016 | $0 | Implemented |
UF0147 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,558 | $334 | Implemented |
UF0147 # 02 Y:1996 | 02 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $578 | $0 | Implemented |
UF0147 # 03 Y:1996 | 03 | 1996 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,865 | $2,300 | Implemented |
UF0147 # 04 Y:1996 | 04 | 1996 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,820 | $450 | Not Implemented |
UF0147 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $496 | $500 | Implemented |
UF0147 # 06 Y:1996 | 06 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $24,681 | $8,000 | Not Implemented |
UF0147 # 07 Y:1996 | 07 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,994 | $0 | Implemented |
UF0146 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,979 | $8,198 | Implemented |
UF0146 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,032 | $1,050 | Implemented |
UF0146 # 03 Y:1996 | 03 | 1996 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $57,061 | $80,000 | Implemented |
UF0146 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $2,637 | $640 | Not Implemented |
UF0146 # 05 Y:1996 | 05 | 1996 | REDUCE DELIVERY SCHEDULES | $3,070 | $0 | Not Implemented |
UF0146 # 06 Y:1996 | 06 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,410 | $3,332 | Implemented |
UF0146 # 07 Y:1996 | 07 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,583 | $4,715 | Not Implemented |
UF0145 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,729 | $8,827 | Not Implemented |
UF0145 # 02 Y:1996 | 02 | 1996 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,843 | $2,500 | Implemented |
UF0145 # 03 Y:1996 | 03 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,532 | $3,500 | Implemented |
UF0145 # 04 Y:1996 | 04 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $39,624 | $18,550 | Not Implemented |
UF0145 # 05 Y:1996 | 05 | 1996 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,868 | $3,575 | Implemented |
UF0145 # 06 Y:1996 | 06 | 1996 | TREAT AND REUSE RINSE WATERS | $11,487 | $40,000 | Implemented |
UF0144 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,468 | $2,440 | Implemented |