IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,704

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0268 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,631 $740 Not Implemented
WI0268 # 07 Y:1996 07 1996 CONVERT TO AQUEOUS CLEANING $1,850 $4,500 Not Implemented
WI0268 # 08 Y:1996 08 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,701 $0 Not Implemented
WI0268 # 09 Y:1996 09 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,415 $500 Not Implemented
WI0268 # 10 Y:1996 10 1996 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $353 $0 Not Implemented
WI0268 # 11 Y:1996 11 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $201 $700 Not Implemented
WI0267 # 01 Y:1996 01 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $27,762 $8,906 n/a
WI0267 # 02 Y:1996 02 1996 USE SYNTHETIC LUBRICANT $16,841 $0 n/a
WI0267 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,729 $45,000 n/a
WI0267 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,635 $39,000 n/a
WI0267 # 05 Y:1996 05 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,054 $16,740 n/a
WI0267 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,670 $0 n/a
WI0267 # 07 Y:1996 07 1996 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $4,867 $0 n/a
WI0267 # 08 Y:1996 08 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,040 $0 n/a
WI0267 # 09 Y:1996 09 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,236 $5,000 n/a
BD0059 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,814 $3,671 Implemented
BD0059 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,601 $6,270 Implemented
BD0059 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,408 $750 Implemented
BD0059 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $1,101 $825 Not Implemented
BD0059 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $543 $750 Not Implemented
BD0059 # 06 Y:1996 06 1996 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $26,027 $7,500 Implemented
BD0059 # 07 Y:1996 07 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $9,618 $370 Not Implemented
BD0059 # 08 Y:1996 08 1996 USE MINIMUM COOLING WATER TO BEARINGS $684 $425 Implemented
BD0058 # 01 Y:1996 01 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,160 $5,420 Implemented
BD0058 # 02 Y:1996 02 1996 INSTALL OCCUPANCY SENSORS $1,983 $1,275 Implemented