Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,103
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0225 # 15 Y:2001 | 15 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $35,000 | $10,440 | Not Implemented |
UD0632 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $94,812 | $8,000 | Implemented |
UD0632 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,500 | $6,000 | Not Implemented |
UD0632 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $15,075 | $0 | Not Implemented |
UD0632 # 04 Y:2001 | 04 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,915 | $0 | Implemented |
UD0632 # 05 Y:2001 | 05 | 2001 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $5,264 | $0 | Implemented |
UD0632 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,400 | $1,846 | Not Implemented |
UD0632 # 07 Y:2001 | 07 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,355 | $0 | Not Implemented |
UD0632 # 08 Y:2001 | 08 | 2001 | INSULATE BARE EQUIPMENT | $315 | $435 | Not Implemented |
UD0632 # 09 Y:2001 | 09 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $307 | $12 | Not Implemented |
UD0632 # 10 Y:2001 | 10 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $207 | $300 | Not Implemented |
WV0224 # 01 Y:2001 | 01 | 2001 | INCREASE AMOUNT OF CONDENSATE RETURNED | $34,989 | $13,233 | Implemented |
WV0224 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,320 | $5,782 | Not Implemented |
WV0224 # 03 Y:2001 | 03 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,209 | $1,000 | Not Implemented |
WV0224 # 04 Y:2001 | 04 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,489 | $2,436 | Implemented |
WV0224 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $1,215 | $583 | Implemented |
WV0224 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $1,103 | $120 | Implemented |
WV0224 # 07 Y:2001 | 07 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,668 | $2,160 | Implemented |
WV0224 # 08 Y:2001 | 08 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,361 | $2,160 | Implemented |
WV0224 # 09 Y:2001 | 09 | 2001 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,176 | $31,000 | Not Implemented |
WV0224 # 10 Y:2001 | 10 | 2001 | RECYCLE WHITE WATER | $4,614 | $1,767 | Not Implemented |
WV0224 # 11 Y:2001 | 11 | 2001 | RECOVER AND REUSE COOLING WATER | $25,740 | $89,000 | Implemented |
WV0224 # 12 Y:2001 | 12 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $20,000 | $14,000 | Not Implemented |
WV0224 # 13 Y:2001 | 13 | 2001 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $100,800 | $19,200 | Not Implemented |
UD0631 # 01 Y:2001 | 01 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $324,000 | $1,600,000 | Implemented |