IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,853

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0234 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,185 $300 Implemented
SF0234 # 02 Y:2002 02 2002 USE PHOTOCELL CONTROLS $8,489 $6,960 Not Implemented
SF0234 # 03 Y:2002 03 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $988 $1,250 Not Implemented
SF0234 # 04 Y:2002 04 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $904 $1,304 Not Implemented
SF0234 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,974 $10,307 Not Implemented
SF0234 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,310 $14,027 Not Implemented
SF0234 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,719 $46,531 Not Implemented
SF0234 # 08 Y:2002 08 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,441 $49,000 Implemented
SF0233 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,975 $0 Implemented
SF0233 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $450 $890 Not Implemented
SD0290 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,119 $92,500 Implemented
SD0290 # 02 Y:2002 02 2002 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,051 $0 Implemented
SD0290 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $13,010 $3,550 Not Implemented
SD0290 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,675 $0 Implemented
SD0290 # 05 Y:2002 05 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,194 $0 Not Implemented
SD0290 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $4,596 $650 Implemented
SD0290 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,780 $5,000 Not Implemented
SD0290 # 08 Y:2002 08 2002 INCREASE USE OF AUTOMATION $58,512 $41,000 Implemented
SD0290 # 09 Y:2002 09 2002 INCREASE USE OF AUTOMATION $124,400 $180,000 Not Implemented
SD0289 # 01 Y:2002 01 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,365,840 $2,430,000 Not Implemented
SD0289 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $57,206 $2,700 Not Implemented
SD0289 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,381 $11,000 Not Implemented
SD0289 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,500 $11,000 Not Implemented
SD0289 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $300 Implemented
SD0289 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $1,066 $800 Not Implemented