IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,890

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0079 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,949 $768 Implemented
NL0079 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,292 $128 Implemented
NL0079 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,953 $392 Implemented
NL0079 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,356 $2,892 Implemented
NL0079 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $2,875 Implemented
MUWT01 # 01 Y:2023 01 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $70 $0 Not Implemented
MUWT01 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $539 $2,176 Not Implemented
MUWT01 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $206 $960 Not Implemented
MUWT01 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $715 $0 Implemented
MUWT01 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $120 $0 Implemented
MUWT01 # 06 Y:2023 06 2023 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $126,128 $453,578 Not Implemented
UU0220 # 01 Y:2023 01 2023 USE HEAT PUMP FOR SPACE CONDITIONING $67,069 $0 Implemented
UU0220 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,986 $13,500 Implemented
UU0220 # 03 Y:2023 03 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,450 $3,366 Not Implemented
UU0220 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,245 $3,810 Not Implemented
UU0220 # 05 Y:2023 05 2023 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,160 $50 Implemented
UU0220 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $920 $1,200 Implemented
KS2316 # 01 Y:2023 01 2023 REPAIR AND ELIMINATE STEAM LEAKS $11,534 $2,766 Implemented
KS2316 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,197 $1,784 Not Implemented
KS2316 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,228 $2,463 Not Implemented
KS2316 # 04 Y:2023 04 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,417 $0 Not Implemented
KS2316 # 05 Y:2023 05 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,127 $627,000 Not Implemented
KS2316 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,198 $29,442 Not Implemented
KS2316 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $7,751 $6,350 Not Implemented
KS2316 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,336 $29,920 Implemented