Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,664
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0093 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,192 | $2,750 | Not Implemented |
WM0093 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $593 | $1,400 | Not Implemented |
BD0489 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,215 | $16,983 | n/a |
BD0489 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,863 | $7,497 | n/a |
BD0489 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $1,418 | $825 | n/a |
BD0489 # 04 Y:2016 | 04 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,075 | $1,320 | n/a |
BD0489 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $744 | $411 | n/a |
BD0489 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $578 | $400 | n/a |
BD0489 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $270 | $800 | n/a |
BD0489 # 08 Y:2016 | 08 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $196 | $400 | n/a |
BD0488 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,086 | $45,630 | n/a |
BD0488 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $4,187 | $600 | n/a |
BD0488 # 03 Y:2016 | 03 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,115 | $3,770 | n/a |
BD0488 # 04 Y:2016 | 04 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,615 | $1,500 | n/a |
BD0488 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $581 | $425 | n/a |
BD0488 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $236 | $800 | n/a |
WM0088 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $71,275 | $132,797 | Not Implemented |
WM0088 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $75,376 | $50,000 | Not Implemented |
WM0088 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,940 | $28,000 | Not Implemented |
WM0088 # 04 Y:2016 | 04 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,075 | $501 | Not Implemented |
WM0088 # 05 Y:2016 | 05 | 2016 | METER WASTE WATER | $4,267 | $375 | Not Implemented |
WM0088 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,245 | $0 | Implemented |
WM0088 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,531 | $6,000 | Not Implemented |
BD0487 # 01 Y:2016 | 01 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $14,385 | $50,000 | Not Implemented |
BD0487 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $3,494 | $825 | Not Implemented |