IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0260 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,910 $647 Implemented
UF0260 # 05 Y:2000 05 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,535 $9,667 Not Implemented
UF0260 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $511 $0 Implemented
UF0260 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $833 $590 Implemented
UF0260 # 08 Y:2000 08 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,994 $4,990 Implemented
UF0260 # 09 Y:2000 09 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,487 $13,000 Implemented
UF0260 # 10 Y:2000 10 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,000 $0 Implemented
UF0260 # 11 Y:2000 11 2000 $58,300 $87,900 Not Implemented
UF0260 # 12 Y:2000 12 2000 $741 $520 Implemented
SD0246 # 01 Y:2000 01 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,493 $27,000 Not Implemented
SD0246 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,870 $14,000 n/a
SD0246 # 03 Y:2000 03 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,276 $3,000 Implemented
SD0246 # 04 Y:2000 04 2000 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $5,400 $0 Not Implemented
SD0246 # 05 Y:2000 05 2000 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $336 $0 Implemented
SD0246 # 06 Y:2000 06 2000 $220,320 $13,000 Implemented
SD0246 # 07 Y:2000 07 2000 $58,552 $13,000 n/a
SD0246 # 08 Y:2000 08 2000 $32,080 $20,000 Implemented
SD0246 # 09 Y:2000 09 2000 $24,480 $15,000 Not Implemented
SD0250 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,106 $210,000 Not Implemented
SD0250 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,752 $600 Implemented
SD0250 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,942 $4,100 Not Implemented
SD0250 # 04 Y:2000 04 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,901 $40,000 Not Implemented
SD0250 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $3,256 $8,000 Not Implemented
SD0250 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $148,200 $8,000 Not Implemented
SD0250 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $97,460 $135,000 Not Implemented