Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0260 # 04 Y:2000 | 04 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,910 | $647 | Implemented |
UF0260 # 05 Y:2000 | 05 | 2000 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,535 | $9,667 | Not Implemented |
UF0260 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $511 | $0 | Implemented |
UF0260 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $833 | $590 | Implemented |
UF0260 # 08 Y:2000 | 08 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,994 | $4,990 | Implemented |
UF0260 # 09 Y:2000 | 09 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,487 | $13,000 | Implemented |
UF0260 # 10 Y:2000 | 10 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $2,000 | $0 | Implemented |
UF0260 # 11 Y:2000 | 11 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $58,300 | $87,900 | Not Implemented |
UF0260 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $741 | $520 | Implemented |
SD0246 # 01 Y:2000 | 01 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $23,493 | $27,000 | Not Implemented |
SD0246 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,870 | $14,000 | n/a |
SD0246 # 03 Y:2000 | 03 | 2000 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,276 | $3,000 | Implemented |
SD0246 # 04 Y:2000 | 04 | 2000 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $5,400 | $0 | Not Implemented |
SD0246 # 05 Y:2000 | 05 | 2000 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $336 | $0 | Implemented |
SD0246 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $220,320 | $13,000 | Implemented |
SD0246 # 07 Y:2000 | 07 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $58,552 | $13,000 | n/a |
SD0246 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $32,080 | $20,000 | Implemented |
SD0246 # 09 Y:2000 | 09 | 2000 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $24,480 | $15,000 | Not Implemented |
SD0250 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,106 | $210,000 | Not Implemented |
SD0250 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,752 | $600 | Implemented |
SD0250 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,942 | $4,100 | Not Implemented |
SD0250 # 04 Y:2000 | 04 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,901 | $40,000 | Not Implemented |
SD0250 # 05 Y:2000 | 05 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $3,256 | $8,000 | Not Implemented |
SD0250 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $148,200 | $8,000 | Not Implemented |
SD0250 # 07 Y:2000 | 07 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $97,460 | $135,000 | Not Implemented |