IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0075 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,146 $5,000 Implemented
TT0075 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,771 $1,152 Implemented
TT0075 # 08 Y:2011 08 2011 ISOLATE HOT OR COLD EQUIPMENT $1,379 $2,500 Implemented
TT0075 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $5,436 Not Implemented
AM0602 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,300 $54,200 Implemented
AM0602 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $31,400 $59,900 Not Implemented
AM0602 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,750 $1,000 Implemented
AM0602 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,890 $28,560 Not Implemented
AM0602 # 05 Y:2011 05 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,120 $0 Implemented
AM0602 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,010 $910 Not Implemented
AM0602 # 07 Y:2011 07 2011 PAY UTILITY BILLS ON TIME $1,680 $0 Not Implemented
LE0327 # 01 Y:2011 01 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $92,227 $175,000 Implemented
LE0327 # 02 Y:2011 02 2011 REPLACE BOILER $91,620 $240,000 Not Implemented
LE0327 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $61,378 $125 Implemented
LE0327 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,335 $94,400 Not Implemented
LE0327 # 05 Y:2011 05 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,778 $2,102 Not Implemented
LE0327 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $5,653 $7,280 Not Implemented
LE0327 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,286 $1,900 Implemented
LE0327 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $400 Not Implemented
LE0326 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,373 $21,660 Implemented
LE0326 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,236 $51,475 Implemented
LE0326 # 03 Y:2011 03 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,313 $108 Implemented
LE0326 # 04 Y:2011 04 2011 INSTALL TIMERS AND/OR THERMOSTATS $6,020 $95 Implemented
LE0326 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,890 $10,580 Implemented
LE0326 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,255 $1,000 Implemented