IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1006 # 03 Y:2022 03 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $454 $25 Not Implemented
CM1006 # 04 Y:2022 04 2022 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $118 $0 Implemented
CM1006 # 05 Y:2022 05 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $156 $500 Implemented
CM1006 # 06 Y:2022 06 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,160 $8,000 Not Implemented
CM1006 # 07 Y:2022 07 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $29,546 $160,998 Implemented
MA0845 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $108,785 $906,122 Not Implemented
LT8369 # 01 Y:2022 01 2022 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,717 $30,030 n/a
LT8369 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,592 $12,831 n/a
LT8369 # 03 Y:2022 03 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,568 $3,852 n/a
CW0125 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,655 $2,019 n/a
CW0125 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,007 $17,900 n/a
CW0125 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $37,427 $1,156 n/a
CW0125 # 04 Y:2022 04 2022 USE SYNTHETIC LUBRICANT $18,816 $9,059 n/a
CW0125 # 05 Y:2022 05 2022 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $23,398 $56,000 n/a
CW0125 # 06 Y:2022 06 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $70,112 $8,000 n/a
CW0125 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,449 $25,995 n/a
CW0125 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $63,307 $41,871 n/a
UU0208 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $9,375 $9,500 Not Implemented
UU0208 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,476 $127,045 Implemented
UU0208 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $4,445 $12,840 Implemented
UU0208 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,292 $7,290 Implemented
UU0208 # 05 Y:2022 05 2022 INSTALL SKYLIGHTS $3,058 $10,560 Not Implemented
UU0208 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $107 Implemented
UD1048 # 01 Y:2022 01 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,150 $1,500 Not Implemented
UD1048 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,915 $625 Not Implemented