IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28,086

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1109 # 08 Y:2024 08 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $18,482 $120,578 Implemented
OK1109 # 09 Y:2024 09 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $125 $825 Implemented
UF0612 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $402,389 $1,529,500 Not Implemented
UF0612 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $55,068 $30,945 Implemented
UF0612 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,994 $20,000 Implemented
UF0612 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44,735 $34,020 Implemented
UF0612 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,865 $8,523 Implemented
UF0612 # 06 Y:2024 06 2024 INSTALL TURBULATORS $13,749 $3,750 Implemented
UF0612 # 07 Y:2024 07 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,443 $21,120 Not Implemented
UF0612 # 08 Y:2024 08 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $7,481 $5,900 Implemented
UF0612 # 09 Y:2024 09 2024 UPGRADE CONTROLS ON COMPRESSORS $5,236 $6,087 Not Implemented
UF0612 # 10 Y:2024 10 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,066 $2,320 Implemented
KS2427 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,324 $5,480 n/a
KS2427 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,216 $90 n/a
KS2427 # 03 Y:2024 03 2024 USE OPTIMUM THICKNESS INSULATION $9,550 $6,688 n/a
KS2427 # 04 Y:2024 04 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $69,076 $156,917 n/a
KS2427 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,928 $156,644 n/a
KS2427 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $45,498 $453,376 n/a
SD0654 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,846 $1,355 Not Implemented
SD0654 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $51,545 $70,429 Not Implemented
SD0654 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,069 $20,212 Not Implemented
SD0654 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,410 $7,109 Not Implemented
SD0654 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,314 $4,469 Not Implemented
SD0654 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,573 $12,716 Not Implemented
SD0654 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,472 $2,019 Not Implemented