Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KG0081 # 01 Y:1997 | 01 | 1997 | INSTALL OCCUPANCY SENSORS | $1,347 | $260 | n/a |
KG0081 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,028 | $317 | n/a |
KG0081 # 03 Y:1997 | 03 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $508 | $260 | n/a |
KG0081 # 04 Y:1997 | 04 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $462,650 | $120 | n/a |
KG0081 # 05 Y:1997 | 05 | 1997 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $89,856 | $0 | n/a |
KG0081 # 06 Y:1997 | 06 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,100,000 | $450 | n/a |
KG0081 # 07 Y:1997 | 07 | 1997 | INSTALL BACK-UP EQUIPMENT | $3,964 | $500 | n/a |
KG0075 # 01 Y:1996 | 01 | 1996 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $26,746 | $0 | Implemented |
KG0075 # 02 Y:1996 | 02 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $10,802 | $1,350 | Implemented |
KG0075 # 03 Y:1996 | 03 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,390 | $0 | Implemented |
KG0075 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,653 | $972 | Not Implemented |
KG0075 # 05 Y:1996 | 05 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,507 | $25 | Not Implemented |
KG0075 # 06 Y:1996 | 06 | 1996 | REVISE RAW MATERIAL SPECS | $11,050 | $0 | Not Implemented |
KG0080 # 01 Y:1997 | 01 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $6,790 | $150 | n/a |
KG0080 # 02 Y:1997 | 02 | 1997 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $5,869 | $500 | n/a |
KG0080 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,024 | $7,350 | n/a |
KG0080 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,637 | $684 | n/a |
KG0080 # 05 Y:1997 | 05 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $939 | $25 | n/a |
KG0080 # 06 Y:1997 | 06 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,537 | $0 | n/a |
KG0080 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $1,296 | $371 | n/a |
KG0080 # 08 Y:1997 | 08 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $36,620 | $3,000 | n/a |
KG0080 # 09 Y:1997 | 09 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $40,917 | $7,500 | n/a |
KG0079 # 01 Y:1997 | 01 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $12,301 | $1,050 | n/a |
KG0079 # 02 Y:1997 | 02 | 1997 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $4,649 | $500 | n/a |
KG0079 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,624 | $4,980 | n/a |