IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0038 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $800 $950 Implemented
BD0038 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,940 $1,500 Implemented
BD0038 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,813 $32,290 Not Implemented
BD0038 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $1,772 $525 Not Implemented
BD0038 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,472 $400 Not Implemented
BD0038 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $195 $170 Implemented
WI0245 # 01 Y:1995 01 1995 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,645 $10,000 Not Implemented
WI0245 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,239 $2,000 Implemented
WI0245 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $722 $1,946 Implemented
WI0245 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $141 $300 Not Implemented
WI0245 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $720 $700 Not Implemented
WI0245 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $351 $1,000 Implemented
WI0245 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $137 $100 Implemented
WI0245 # 08 Y:1995 08 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $283 $0 Not Implemented
WI0245 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $0 Implemented
WI0245 # 10 Y:1995 10 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $119 $0 Implemented
WI0246 # 01 Y:1995 01 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,378 $12,000 Not Implemented
WI0246 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,034 $2,000 Not Implemented
WI0246 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,406 $1,600 Not Implemented
WI0246 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,533 $2,043 Implemented
WI0246 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $288 $0 Implemented
WI0246 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,059 $1,581 Implemented
WI0246 # 07 Y:1995 07 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,406 $10,000 Not Implemented
WI0246 # 08 Y:1995 08 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,210 $5,800 Implemented
WI0246 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $404 $500 Not Implemented