IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1005 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,490 $2,690 Implemented
CI0002 # 01 Y:2022 01 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $33,479 $80,000 n/a
CI0002 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,300 $24,600 n/a
CI0002 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,201 $1,800 n/a
CI0002 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,649 $30,000 n/a
CI0002 # 05 Y:2022 05 2022 UPGRADE CONVEYORS $3,825 $8,040 n/a
CI0002 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $3,680 $0 n/a
CI0002 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,733 $2,167 n/a
CI0002 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,717 $2,625 n/a
CI0002 # 09 Y:2022 09 2022 USE PHOTOCELL CONTROLS $1,322 $1,350 n/a
OR0761 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,913 $1,078 Implemented
OR0761 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,934 $9,934 Implemented
OR0761 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,236 $26,406 Not Implemented
OR0761 # 04 Y:2022 04 2022 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $31,013 $150,000 Not Implemented
UL2212 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,840 $16,294 Not Implemented
UL2212 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,208 $2,171 Not Implemented
UL2212 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,936 $19,500 Not Implemented
UL2212 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $34,406 $237,031 Not Implemented
UL2212 # 05 Y:2022 05 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,902 $63,000 Not Implemented
WV0632 # 01 Y:2022 01 2022 MINIMIZE WATER USAGE $12,558 $11,644 Not Implemented
WV0632 # 02 Y:2022 02 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $5,035 $3,423 Implemented
WV0632 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $4,403 $2,234 Not Implemented
WV0632 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,805 $706 Implemented
WV0632 # 05 Y:2022 05 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,169 $5,688 Not Implemented
WV0632 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,112 $1,037 Implemented