Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,433
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0044 # 03 Y:2002 | 03 | 2002 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $5,678 | $2,120 | Not Implemented |
LM0044 # 04 Y:2002 | 04 | 2002 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $14,885 | $0 | Implemented |
LM0044 # 05 Y:2002 | 05 | 2002 | PURCHASE APPROPRIATELY SIZED MATERIAL | $216,000 | $3,400 | Implemented |
LM0044 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $159,315 | $6,792 | Not Implemented |
LM0044 # 07 Y:2002 | 07 | 2002 | MODIFY STARTUP/SHUTDOWN TIMES | $5,695 | $300 | Not Implemented |
SD0307 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $115,174 | $476,400 | Not Implemented |
SD0307 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,963 | $18,000 | Not Implemented |
SD0307 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $1,517 | $2,500 | Not Implemented |
SD0307 # 04 Y:2002 | 04 | 2002 | INSTALL OCCUPANCY SENSORS | $933 | $1,200 | Not Implemented |
SD0307 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $785 | $0 | Not Implemented |
SD0307 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,134 | $5,000 | Not Implemented |
SF0242 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,642 | $300 | Implemented |
SF0242 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,176 | $572 | Implemented |
SF0242 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,518 | $1,217 | Implemented |
SF0242 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,397 | $3,036 | Not Implemented |
SF0242 # 05 Y:2002 | 05 | 2002 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $553 | $1,000 | Not Implemented |
SF0242 # 06 Y:2002 | 06 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,020 | $3,067 | Not Implemented |
SF0242 # 07 Y:2002 | 07 | 2002 | USE PHOTOCELL CONTROLS | $433 | $1,200 | Not Implemented |
SF0242 # 08 Y:2002 | 08 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $16,216 | $16,216 | Not Implemented |
SF0241 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,590 | $0 | Implemented |
SF0241 # 02 Y:2002 | 02 | 2002 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,388 | $380 | Not Implemented |
SF0241 # 03 Y:2002 | 03 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,551 | $1,000 | Not Implemented |
SF0241 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,747 | $777 | Not Implemented |
SF0241 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $238 | $120 | Not Implemented |
SF0241 # 06 Y:2002 | 06 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $1,694 | $1,002 | Not Implemented |