Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1030 # 09 Y:2021 | 09 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,747 | $7,500 | Not Implemented |
UD1029 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,908 | $340 | Not Implemented |
UD1029 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,027 | $4,000 | Not Implemented |
UD1029 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $541 | $0 | Not Implemented |
UD1029 # 04 Y:2021 | 04 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $138 | $0 | Not Implemented |
UD1029 # 05 Y:2021 | 05 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,922 | $10,000 | Not Implemented |
UD1029 # 06 Y:2021 | 06 | 2021 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,088 | $4,500 | Not Implemented |
UD1029 # 07 Y:2021 | 07 | 2021 | USE MINIMUM STEAM OPERATING PRESSURE | $1,533 | $0 | Not Implemented |
UD1029 # 08 Y:2021 | 08 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $995 | $0 | Not Implemented |
UD1029 # 09 Y:2021 | 09 | 2021 | TURN OFF STEAM TRACING DURING MILD WEATHER | $876 | $0 | Not Implemented |
UD1028 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,034 | $0 | Not Implemented |
UD1028 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $782 | $0 | Implemented |
UD1028 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $196 | $0 | Not Implemented |
UD1028 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,469 | $4,200 | Not Implemented |
UD1028 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,623 | $5,000 | Not Implemented |
UD1028 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,408 | $2,814 | Implemented |
UD1028 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $0 | Not Implemented |
UD1028 # 08 Y:2021 | 08 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $210 | $600 | Not Implemented |
UD1028 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $3,730 | $5,760 | Not Implemented |
UD1027 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,612 | $0 | Implemented |
UD1027 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,486 | $1,000 | Not Implemented |
UD1027 # 03 Y:2021 | 03 | 2021 | RECOVER AND REUSE COOLING WATER | $7,993 | $0 | Not Implemented |
UD1027 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,522 | $0 | Not Implemented |
UD1027 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,842 | $1,000 | Implemented |
UD1027 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,443 | $0 | Not Implemented |