IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1030 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,747 $7,500 Not Implemented
UD1029 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,908 $340 Not Implemented
UD1029 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,027 $4,000 Not Implemented
UD1029 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $541 $0 Not Implemented
UD1029 # 04 Y:2021 04 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $138 $0 Not Implemented
UD1029 # 05 Y:2021 05 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,922 $10,000 Not Implemented
UD1029 # 06 Y:2021 06 2021 REDUCE EXCESSIVE BOILER BLOWDOWN $2,088 $4,500 Not Implemented
UD1029 # 07 Y:2021 07 2021 USE MINIMUM STEAM OPERATING PRESSURE $1,533 $0 Not Implemented
UD1029 # 08 Y:2021 08 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $995 $0 Not Implemented
UD1029 # 09 Y:2021 09 2021 TURN OFF STEAM TRACING DURING MILD WEATHER $876 $0 Not Implemented
UD1028 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,034 $0 Not Implemented
UD1028 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $782 $0 Implemented
UD1028 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $0 Not Implemented
UD1028 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,469 $4,200 Not Implemented
UD1028 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,623 $5,000 Not Implemented
UD1028 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,408 $2,814 Implemented
UD1028 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $0 Not Implemented
UD1028 # 08 Y:2021 08 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $210 $600 Not Implemented
UD1028 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $3,730 $5,760 Not Implemented
UD1027 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,612 $0 Implemented
UD1027 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,486 $1,000 Not Implemented
UD1027 # 03 Y:2021 03 2021 RECOVER AND REUSE COOLING WATER $7,993 $0 Not Implemented
UD1027 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,522 $0 Not Implemented
UD1027 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,842 $1,000 Implemented
UD1027 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,443 $0 Not Implemented