Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0948 # 01 Y:2016 | 01 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,142 | $29,000 | Not Implemented |
OK0948 # 02 Y:2016 | 02 | 2016 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,510 | $2,320 | Implemented |
OK0948 # 03 Y:2016 | 03 | 2016 | USE PHOTOCELL CONTROLS | $862 | $3,870 | Not Implemented |
OK0948 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,857 | $18,014 | Not Implemented |
OK0948 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,007 | $926 | Not Implemented |
OK0948 # 06 Y:2016 | 06 | 2016 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $27,228 | $83,600 | Implemented |
OK0948 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,797 | $118,583 | Not Implemented |
OK0948 # 08 Y:2016 | 08 | 2016 | USE OPTIMUM THICKNESS INSULATION | $382 | $1,310 | Implemented |
OK0948 # 09 Y:2016 | 09 | 2016 | USE OPTIMUM THICKNESS INSULATION | $58 | $203 | Implemented |
OK0948 # 10 Y:2016 | 10 | 2016 | USE POWER DURING OFF-PEAK PERIODS | $12,184 | $0 | Not Implemented |
OK0948 # 11 Y:2016 | 11 | 2016 | OPTIMIZE PLANT POWER FACTOR | $7,251 | $25,830 | Implemented |
OK0947 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,871 | $92,000 | Not Implemented |
OK0947 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $985 | $3,780 | Not Implemented |
OK0947 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,495 | $9,720 | Not Implemented |
OK0947 # 04 Y:2016 | 04 | 2016 | INSULATE BARE EQUIPMENT | $11,683 | $10,036 | Not Implemented |
OK0947 # 05 Y:2016 | 05 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $3,754 | $19,570 | Not Implemented |
OK0947 # 06 Y:2016 | 06 | 2016 | INSTALL SET-BACK TIMERS | $483 | $410 | Not Implemented |
OK0947 # 07 Y:2016 | 07 | 2016 | OPTIMIZE PLANT POWER FACTOR | $4,680 | $27,500 | Not Implemented |
OK0947 # 08 Y:2016 | 08 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $368 | $822 | Not Implemented |
OK0947 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,092 | $2,000 | Not Implemented |
OK0947 # 10 Y:2016 | 10 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $362 | $540 | Not Implemented |
OK0940 # 01 Y:2016 | 01 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,811 | $17,000 | Not Implemented |
OK0940 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,586 | $7,700 | Not Implemented |
OK0940 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,231 | $2,782 | Implemented |
OK0940 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,330 | $17,442 | Not Implemented |