IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0737 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,105 $4,013 Implemented
NC0236 # 01 Y:2002 01 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,684 $6,000 Not Implemented
NC0236 # 02 Y:2002 02 2002 DEVELOP A REPAIR/REPLACE POLICY $4,419 $8,200 Implemented
NC0236 # 03 Y:2002 03 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,606 $550 Not Implemented
NC0236 # 04 Y:2002 04 2002 USE PHOTOCELL CONTROLS $115 $260 Implemented
NC0235 # 01 Y:2002 01 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,277 $100 Implemented
NC0235 # 02 Y:2002 02 2002 INSTALL BACK-UP EQUIPMENT $156,500 $1,000 Not Implemented
NC0235 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,464 $550 Not Implemented
NC0235 # 04 Y:2002 04 2002 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $30,410 $1,000 Implemented
NC0235 # 05 Y:2002 05 2002 DEVELOP A REPAIR/REPLACE POLICY $23,267 $15,570 Implemented
NC0235 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $2,434 Implemented
NC0235 # 07 Y:2002 07 2002 RECOVER AND REUSE COOLING WATER $213 $500 Not Implemented
NC0208 # 01 Y:2001 01 2001 USE OPTIMUM THICKNESS INSULATION $2,937 $4,950 Not Implemented
NC0208 # 02 Y:2001 02 2001 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $45,000 $21,500 Not Implemented
NC0208 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,700 Implemented
NC0208 # 04 Y:2001 04 2001 USE PHOTOCELL CONTROLS $113 $200 Implemented
NC0208 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $792 $100 Implemented
NC0208 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $200 Not Implemented
NC0208 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $22,836 $6,500 Implemented
GT0717 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,765 $16,300 Implemented
GT0717 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $10,500 Implemented
GT0717 # 03 Y:2001 03 2001 COVER OPEN TANKS $17,390 $4,510 Not Implemented
GT0717 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,475 $4,275 Not Implemented
GT0717 # 05 Y:2001 05 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,600 $0 Not Implemented
GT0717 # 06 Y:2001 06 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,465 $67,250 Implemented