IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0015 # 04 Y:2001 04 2001 USE SYNTHETIC LUBRICANT $1,715 $800 Not Implemented
UU0015 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,486 $5,165 Not Implemented
UU0015 # 06 Y:2001 06 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $839 $0 Not Implemented
UU0015 # 07 Y:2001 07 2001 IMPROVE COMBUSTION CONTROL CAPABILITY $12,189 $21,500 Not Implemented
LE0124 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,821 $2,500 Not Implemented
LE0124 # 02 Y:2001 02 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $81,412 $10,000 Not Implemented
LE0124 # 03 Y:2001 03 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,427 $1,000 Not Implemented
LE0124 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,534 $34,550 Not Implemented
LE0124 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $6,721 $400 Not Implemented
LE0124 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,798 $0 Not Implemented
NC0226 # 01 Y:2001 01 2001 DEVELOP A REPAIR/REPLACE POLICY $10,828 $12,834 Not Implemented
NC0226 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,348 $500 Not Implemented
NC0226 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,071 $407 Not Implemented
NC0226 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,800 $400 Not Implemented
NC0226 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,122 $2,225 Not Implemented
NC0226 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $279 $150 Not Implemented
NC0226 # 07 Y:2001 07 2001 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $23,668 $26,000 Not Implemented
NC0226 # 08 Y:2001 08 2001 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $93,403 $-312,000 Not Implemented
UU0014 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,374 $9,639 Not Implemented
UU0014 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,319 $60 Implemented
UU0014 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $440 Implemented
UU0014 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $602 $1,195 Not Implemented
UU0014 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $192 $300 Not Implemented
GT0719 # 01 Y:2001 01 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $80,000 $125,000 n/a
GT0719 # 02 Y:2001 02 2001 $18,750 $1,500 n/a