Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0042 # 06 Y:2002 | 06 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $407 | $145 | Not Implemented |
IC0042 # 07 Y:2002 | 07 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $1,160 | $435 | Not Implemented |
IC0042 # 08 Y:2002 | 08 | 2002 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $53,956 | $110,000 | Not Implemented |
MS0215 # 01 Y:2002 | 01 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,023 | $50 | Implemented |
MS0215 # 02 Y:2002 | 02 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,672 | $1,484 | Not Implemented |
MS0215 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,018 | $151 | Not Implemented |
MS0215 # 04 Y:2002 | 04 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $500 | $708 | Implemented |
NC0251 # 01 Y:2002 | 01 | 2002 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $29,079 | $130,000 | Not Implemented |
NC0251 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $50,797 | $100,000 | Not Implemented |
NC0251 # 03 Y:2002 | 03 | 2002 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $4,593 | $7,000 | Not Implemented |
NC0251 # 04 Y:2002 | 04 | 2002 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $6,367 | $10,000 | Implemented |
NC0251 # 05 Y:2002 | 05 | 2002 | ADJUST BURNERS FOR EFFICIENT OPERATION | $4,768 | $10,000 | Implemented |
NC0251 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $137 | $574 | Implemented |
UD0657 # 01 Y:2002 | 01 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $1,600,000 | $339,333 | Implemented |
UD0657 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $186,552 | $719,845 | Not Implemented |
UD0657 # 03 Y:2002 | 03 | 2002 | USE RADIANT HEATER FOR SPOT HEATING | $25,129 | $10,500 | Not Implemented |
UD0657 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,470 | $0 | Implemented |
UD0657 # 05 Y:2002 | 05 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,040 | $9,089 | Not Implemented |
UD0657 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $894 | $1,000 | Not Implemented |
UD0657 # 07 Y:2002 | 07 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $805 | $97 | Not Implemented |
SU0144 # 01 Y:2002 | 01 | 2002 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,266 | $12,159 | Not Implemented |
SU0144 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $3,865 | $181 | Implemented |
SU0144 # 03 Y:2002 | 03 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,993 | $870 | Implemented |
SU0144 # 04 Y:2002 | 04 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,289 | $1,344 | Not Implemented |
SU0144 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $649 | $2,150 | Not Implemented |