IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1513 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $363 $747 Implemented
UK1513 # 03 Y:2015 03 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $284 $0 Implemented
UK1513 # 04 Y:2015 04 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,053 $0 Implemented
UK1513 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,440 $1,500 Implemented
UK1513 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $12,766 $14,063 Implemented
UK1513 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,363 $440 Implemented
UK1513 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,883 $1,750 Implemented
UK1513 # 09 Y:2015 09 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,308 $8,000 Not Implemented
UK1513 # 10 Y:2015 10 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,629 $4,340 Implemented
UK1513 # 11 Y:2015 11 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,743 $10,894 Implemented
UK1513 # 12 Y:2015 12 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $970 $540 Not Implemented
WM0075 # 01 Y:2015 01 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $331,900 $300,000 Not Implemented
WM0075 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $68,035 $93,132 Not Implemented
WM0075 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,881 $34,000 Not Implemented
WM0075 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,819 $46,125 Not Implemented
WM0075 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,025 $1,280 Not Implemented
WM0075 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,069 $852 Not Implemented
WM0075 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,880 $330 Not Implemented
WM0075 # 08 Y:2015 08 2015 INSULATE BARE EQUIPMENT $2,454 $1,014 Not Implemented
WM0075 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $270 $495 Implemented
WM0075 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $151 $298 Not Implemented
OR0661 # 01 Y:2015 01 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $52,251 $18,807 Implemented
OR0661 # 02 Y:2015 02 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $76,637 $205,256 Not Implemented
OR0661 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $1,989 $170 Implemented
OR0661 # 04 Y:2015 04 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,575 $3,600 Not Implemented