IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0165 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,709 $7,202 Not Implemented
WM0165 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,846 $0 Not Implemented
WM0165 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,552 $6,405 Not Implemented
WM0165 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,370 $1,800 Not Implemented
WM0165 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,324 $4,100 Not Implemented
WM0165 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,598 $3,500 Not Implemented
WM0165 # 08 Y:2021 08 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,497 $0 Not Implemented
WM0165 # 09 Y:2021 09 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,028 $2,237 Not Implemented
OK1052 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $1,512 $6,000 Not Implemented
OK1052 # 02 Y:2021 02 2021 USE RADIANT HEATER FOR SPOT HEATING $4,517 $19,500 Not Implemented
OK1052 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,322 $0 Not Implemented
OK1052 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,648 $13,284 Implemented
OK1052 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,203 $586 Not Implemented
CL2112 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $2,080 $5,100 n/a
CL2112 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,367 $0 n/a
CL2112 # 03 Y:2021 03 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $293 $260 n/a
CL2112 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,967 $17,500 n/a
CL2112 # 05 Y:2021 05 2021 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $192 $0 n/a
BS0154 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,750 $3,231 Not Implemented
BS0154 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $679 $280 Not Implemented
BS0154 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,232 $320 Not Implemented
BS0154 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $766 $25 Not Implemented
BS0154 # 05 Y:2021 05 2021 ADOPT IN-HOUSE MATERIAL GENERATION $182,277 $204,462 Not Implemented
BS0154 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $8,288 $6,000 Not Implemented
BS0154 # 07 Y:2021 07 2021 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $893 $710 Not Implemented