Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0165 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,709 | $7,202 | Not Implemented |
WM0165 # 03 Y:2021 | 03 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,846 | $0 | Not Implemented |
WM0165 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,552 | $6,405 | Not Implemented |
WM0165 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $2,370 | $1,800 | Not Implemented |
WM0165 # 06 Y:2021 | 06 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,324 | $4,100 | Not Implemented |
WM0165 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,598 | $3,500 | Not Implemented |
WM0165 # 08 Y:2021 | 08 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,497 | $0 | Not Implemented |
WM0165 # 09 Y:2021 | 09 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,028 | $2,237 | Not Implemented |
OK1052 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $1,512 | $6,000 | Not Implemented |
OK1052 # 02 Y:2021 | 02 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $4,517 | $19,500 | Not Implemented |
OK1052 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,322 | $0 | Not Implemented |
OK1052 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,648 | $13,284 | Implemented |
OK1052 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $2,203 | $586 | Not Implemented |
CL2112 # 01 Y:2021 | 01 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $2,080 | $5,100 | n/a |
CL2112 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,367 | $0 | n/a |
CL2112 # 03 Y:2021 | 03 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $293 | $260 | n/a |
CL2112 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,967 | $17,500 | n/a |
CL2112 # 05 Y:2021 | 05 | 2021 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $192 | $0 | n/a |
BS0154 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,750 | $3,231 | Not Implemented |
BS0154 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $679 | $280 | Not Implemented |
BS0154 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,232 | $320 | Not Implemented |
BS0154 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $766 | $25 | Not Implemented |
BS0154 # 05 Y:2021 | 05 | 2021 | ADOPT IN-HOUSE MATERIAL GENERATION | $182,277 | $204,462 | Not Implemented |
BS0154 # 06 Y:2021 | 06 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,288 | $6,000 | Not Implemented |
BS0154 # 07 Y:2021 | 07 | 2021 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $893 | $710 | Not Implemented |