IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0076 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,973 $2,100 n/a
KG0076 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $18,271 $4,600 n/a
KG0076 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,757 $593 n/a
KG0076 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $562 $450 n/a
KG0076 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,248 $0 n/a
KG0076 # 07 Y:1997 07 1997 RECOVER AND REUSE WASTE MATERIAL $2,333 $0 n/a
KG0076 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,557,504 $4,414 n/a
KG0070 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,417 $0 Not Implemented
KG0070 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,060 $4,750 Implemented
KG0070 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $464 Implemented
KG0070 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,582 $600 Implemented
KG0070 # 05 Y:1996 05 1996 REDUCE SCRAP PRODUCTION $3,326 $500 Implemented
KG0070 # 06 Y:1996 06 1996 REDUCE SCRAP PRODUCTION $24,864 $5,000 Implemented
KG0072 # 01 Y:1996 01 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,148 $0 Not Implemented
KG0072 # 02 Y:1996 02 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,206 $0 Implemented
KG0072 # 03 Y:1996 03 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,396 $1,500 Implemented
KG0072 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $25 Implemented
KG0072 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,255 $1,900 Not Implemented
KG0072 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $966 $150 Not Implemented
KG0072 # 07 Y:1996 07 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $955 $0 Not Implemented
KG0072 # 08 Y:1996 08 1996 REDUCE SCRAP PRODUCTION $21,888 $2,000 Not Implemented
AM0285 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $49,000 $70,000 Implemented
AM0285 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,300 $47,880 Not Implemented
AM0285 # 03 Y:1996 03 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,830 $5,660 Implemented
AM0285 # 04 Y:1996 04 1996 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $465 $0 Not Implemented