Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0575 # 03 Y:1999 | 03 | 1999 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $39,515 | $10,000 | Implemented |
UD0575 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,341 | $15,000 | Implemented |
UD0574 # 01 Y:1999 | 01 | 1999 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $53,280 | $5,000 | Not Implemented |
UD0574 # 02 Y:1999 | 02 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $44,950 | $110,000 | Not Implemented |
UD0574 # 03 Y:1999 | 03 | 1999 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $11,550 | $0 | Not Implemented |
UD0574 # 04 Y:1999 | 04 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,572 | $0 | Implemented |
UD0574 # 05 Y:1999 | 05 | 1999 | REDUCE OR ELIMINATE WASTE | $6,643 | $10,000 | Not Implemented |
UD0573 # 01 Y:1999 | 01 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $238,622 | $0 | Implemented |
UD0573 # 02 Y:1999 | 02 | 1999 | RECYCLE CASTING SAND | $159,120 | $310,000 | Implemented |
UD0573 # 03 Y:1999 | 03 | 1999 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $30,590 | $30,500 | Not Implemented |
UD0573 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,431 | $6,000 | Not Implemented |
UD0573 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,523 | $14,669 | Implemented |
UD0573 # 06 Y:1999 | 06 | 1999 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $1,294 | $200 | Not Implemented |
UD0572 # 01 Y:1999 | 01 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $948,600 | $580,553 | Not Implemented |
UD0572 # 02 Y:1999 | 02 | 1999 | USE PLASTIC PALLETS INSTEAD OF WOOD | $38,960 | $110,457 | Implemented |
UD0572 # 03 Y:1999 | 03 | 1999 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $28,186 | $41,000 | Not Implemented |
UD0572 # 04 Y:1999 | 04 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $9,457 | $-27,115 | Implemented |
UD0571 # 01 Y:1999 | 01 | 1999 | RECYCLE CASTING SAND | $227,844 | $135,000 | Implemented |
UD0571 # 02 Y:1999 | 02 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $67,000 | $24,000 | Not Implemented |
UD0571 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $27,700 | $40,000 | Not Implemented |
UD0571 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,000 | $64,000 | Implemented |
UD0571 # 05 Y:1999 | 05 | 1999 | CONVERT TO AQUEOUS CLEANING SYSTEM | $18,667 | $0 | Not Implemented |
UD0571 # 06 Y:1999 | 06 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,800 | $0 | Not Implemented |
UD0571 # 07 Y:1999 | 07 | 1999 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $9,000 | $24,000 | Not Implemented |
UD0571 # 08 Y:1999 | 08 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,582 | $0 | Implemented |