Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0580 # 08 Y:1999 | 08 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $1,713 | $2,500 | Not Implemented |
UD0580 # 09 Y:1999 | 09 | 1999 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $1,418 | $0 | Not Implemented |
UD0579 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $250,000 | $325,000 | Not Implemented |
UD0579 # 02 Y:1999 | 02 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $25,726 | $7,500 | Implemented |
UD0579 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,050 | $8,000 | Implemented |
UD0579 # 04 Y:1999 | 04 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,690 | $2,850 | Implemented |
UD0579 # 05 Y:1999 | 05 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,782 | $2,000 | Not Implemented |
UD0579 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $0 | Implemented |
UD0578 # 01 Y:1999 | 01 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $323,997 | $26,940 | Implemented |
UD0578 # 02 Y:1999 | 02 | 1999 | DEVELOP STANDARD OPERATING PROCEDURES | $26,052 | $0 | Not Implemented |
UD0578 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $19,500 | $8,600 | Implemented |
UD0578 # 04 Y:1999 | 04 | 1999 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $17,671 | $3,000 | Implemented |
UD0578 # 05 Y:1999 | 05 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $8,867 | $0 | Not Implemented |
UD0578 # 06 Y:1999 | 06 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,242 | $0 | Implemented |
UD0578 # 07 Y:1999 | 07 | 1999 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $3,939 | $6,750 | Not Implemented |
UD0578 # 08 Y:1999 | 08 | 1999 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,734 | $13,000 | Not Implemented |
UD0578 # 09 Y:1999 | 09 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,220 | $230 | Not Implemented |
UD0578 # 10 Y:1999 | 10 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,140 | $0 | Not Implemented |
UM0147 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,038 | $3,557 | Not Implemented |
UM0147 # 02 Y:1999 | 02 | 1999 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,796 | $2,000 | Not Implemented |
UM0147 # 03 Y:1999 | 03 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $19,748 | $500 | Not Implemented |
UM0147 # 04 Y:1999 | 04 | 1999 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,215 | $10,000 | Not Implemented |
UM0147 # 05 Y:1999 | 05 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $1,436 | $0 | Implemented |
UM0147 # 06 Y:1999 | 06 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $990 | $400 | Not Implemented |
UD0577 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $640,050 | $1,000,000 | Not Implemented |