Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,103
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0596 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $33,230 | $60,000 | Not Implemented |
UD0596 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,200 | $27,423 | Implemented |
UD0596 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,221 | $1,200 | Implemented |
UD0596 # 04 Y:2000 | 04 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,651 | $1,298 | Not Implemented |
UD0596 # 05 Y:2000 | 05 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,699 | $3,072 | Not Implemented |
UD0595 # 01 Y:2000 | 01 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $330,000 | $0 | Not Implemented |
UD0595 # 02 Y:2000 | 02 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $96,096 | $106,000 | Not Implemented |
UD0595 # 03 Y:2000 | 03 | 2000 | CONDENSE OPERATION INTO ONE BUILDING | $14,451 | $5,000 | Not Implemented |
UD0595 # 04 Y:2000 | 04 | 2000 | REDUCE SCRAP PRODUCTION | $11,016 | $20,400 | Not Implemented |
UD0595 # 05 Y:2000 | 05 | 2000 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,851 | $2,000 | Not Implemented |
UD0595 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,230 | $846 | Not Implemented |
WV0190 # 01 Y:2000 | 01 | 2000 | IMPROVE COMBUSTION CONTROL CAPABILITY | $204,769 | $34,000 | Implemented |
WV0190 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,748 | $9,600 | Not Implemented |
WV0190 # 03 Y:2000 | 03 | 2000 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $24,565 | $9,120 | Not Implemented |
WV0190 # 04 Y:2000 | 04 | 2000 | COVER OPEN TANKS | $11,730 | $5,760 | Implemented |
WV0190 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $920 | $850 | Not Implemented |
WV0190 # 06 Y:2000 | 06 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,883 | $780 | Implemented |
WV0190 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $63,174 | $66,000 | Implemented |
WV0190 # 08 Y:2000 | 08 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,768 | $2,868 | Not Implemented |
WV0190 # 09 Y:2000 | 09 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,514 | $30 | Not Implemented |
WV0190 # 10 Y:2000 | 10 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $52,195 | $13,550 | Not Implemented |
WV0190 # 11 Y:2000 | 11 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $66,820 | $78,000 | Implemented |
WV0190 # 12 Y:2000 | 12 | 2000 | INSTALL SENSORS TO DETECT DEFECTS | $1,785,600 | $2,400,000 | Not Implemented |
WV0190 # 13 Y:2000 | 13 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,000 | $6,240 | Not Implemented |
UD0594 # 01 Y:2000 | 01 | 2000 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $189,338 | $180,000 | Not Implemented |