IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0563 # 08 Y:1999 08 1999 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,880 $8,471 Not Implemented
UD0562 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,767 $10,000 Not Implemented
UD0562 # 02 Y:1999 02 1999 USE POWER DURING OFF-PEAK PERIODS $10,130 $0 Implemented
UD0562 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,200 $4,000 Not Implemented
UD0562 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,677 $1,040 Implemented
UD0562 # 05 Y:1999 05 1999 FILTER AND REUSE HYDRAULIC OIL $5,340 $4,000 Not Implemented
UD0562 # 06 Y:1999 06 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,976 $13,500 Not Implemented
UD0562 # 07 Y:1999 07 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,344 $4,000 Not Implemented
UD0562 # 08 Y:1999 08 1999 REPROCESS SPENT OILS ON SITE FOR RE-USE $2,041 $3,000 Not Implemented
UD0561 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $100,000 $200,000 Not Implemented
UD0561 # 02 Y:1999 02 1999 USE POWER DURING OFF-PEAK PERIODS $12,265 $5,000 Not Implemented
UD0561 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,566 $8,140 Implemented
UD0561 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,418 $14,216 Implemented
UD0561 # 05 Y:1999 05 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,139 $3,000 Not Implemented
UD0561 # 06 Y:1999 06 1999 RECYCLE WASTE INK AND CLEANUP SOLVENT $942 $3,000 Not Implemented
UD0561 # 07 Y:1999 07 1999 ADD AREA LIGHTING SWITCHES $877 $0 Not Implemented
UM0132 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,280 $7,301 Implemented
UM0132 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $680 $700 Implemented
UM0132 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $300 Implemented
UM0132 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $1,000 Implemented
UM0132 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $815 $990 Implemented
UM0132 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,503 $3,700 Implemented
UM0132 # 07 Y:1999 07 1999 USE LOW VOC OR WATER BASED PAINT $5,439 $500 Implemented
UM0132 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $53,333 $1,548 Not Implemented
UD0560 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $880,000 $2,100,000 Not Implemented