Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0563 # 08 Y:1999 | 08 | 1999 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,880 | $8,471 | Not Implemented |
UD0562 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,767 | $10,000 | Not Implemented |
UD0562 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $10,130 | $0 | Implemented |
UD0562 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,200 | $4,000 | Not Implemented |
UD0562 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,677 | $1,040 | Implemented |
UD0562 # 05 Y:1999 | 05 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $5,340 | $4,000 | Not Implemented |
UD0562 # 06 Y:1999 | 06 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,976 | $13,500 | Not Implemented |
UD0562 # 07 Y:1999 | 07 | 1999 | RECYCLE CLEANING SOLVENT AND REUSE | $2,344 | $4,000 | Not Implemented |
UD0562 # 08 Y:1999 | 08 | 1999 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $2,041 | $3,000 | Not Implemented |
UD0561 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $100,000 | $200,000 | Not Implemented |
UD0561 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $12,265 | $5,000 | Not Implemented |
UD0561 # 03 Y:1999 | 03 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,566 | $8,140 | Implemented |
UD0561 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,418 | $14,216 | Implemented |
UD0561 # 05 Y:1999 | 05 | 1999 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $1,139 | $3,000 | Not Implemented |
UD0561 # 06 Y:1999 | 06 | 1999 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $942 | $3,000 | Not Implemented |
UD0561 # 07 Y:1999 | 07 | 1999 | ADD AREA LIGHTING SWITCHES | $877 | $0 | Not Implemented |
UM0132 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,280 | $7,301 | Implemented |
UM0132 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $680 | $700 | Implemented |
UM0132 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $667 | $300 | Implemented |
UM0132 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $349 | $1,000 | Implemented |
UM0132 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $815 | $990 | Implemented |
UM0132 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,503 | $3,700 | Implemented |
UM0132 # 07 Y:1999 | 07 | 1999 | USE LOW VOC OR WATER BASED PAINT | $5,439 | $500 | Implemented |
UM0132 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,333 | $1,548 | Not Implemented |
UD0560 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $880,000 | $2,100,000 | Not Implemented |