Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,514
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2317 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,763 | $17,190 | Not Implemented |
UC2317 # 08 Y:2023 | 08 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,409 | $34,609 | Not Implemented |
UC2317 # 09 Y:2023 | 09 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $30,659 | $188,853 | Not Implemented |
UC2317 # 10 Y:2023 | 10 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $6,903 | $1,468 | Not Implemented |
UC2317 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $321,413 | $2,701,940 | Not Implemented |
UC2317 # 12 Y:2023 | 12 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,411 | $0 | Not Implemented |
UL2316 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,992 | $0 | Implemented |
UL2316 # 02 Y:2023 | 02 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $73,247 | $137,300 | Not Implemented |
UL2316 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,167 | $989,084 | Not Implemented |
UL2316 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,026 | $0 | Implemented |
UL2316 # 05 Y:2023 | 05 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,036 | $20,000 | Not Implemented |
UL2316 # 06 Y:2023 | 06 | 2023 | INSTALL HYDROGEN FUEL CELL | $281,388 | $1,750,000 | Not Implemented |
UU0240 # 01 Y:2024 | 01 | 2024 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,047 | $10,320 | Not Implemented |
UU0240 # 02 Y:2024 | 02 | 2024 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,601 | $7,755 | Implemented |
UU0240 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,286 | $1,500 | Implemented |
UU0240 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $977 | $113 | Implemented |
UU0240 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $544 | $1,387 | Implemented |
WM0210 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $12,043 | $21,250 | Not Implemented |
WM0210 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,116 | $0 | Not Implemented |
WM0210 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,452 | $0 | Not Implemented |
WM0210 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,808 | $1,400 | Implemented |
WM0210 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,410 | $7,096 | Implemented |
WM0210 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,041 | $278 | Not Implemented |
WM0210 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $566 | $1,050 | Not Implemented |
WM0210 # 08 Y:2024 | 08 | 2024 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $564 | $1,417 | Not Implemented |