Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0564 # 04 Y:1999 | 04 | 1999 | COVER OPEN TANKS | $13,847 | $2,400 | Implemented |
UD0564 # 05 Y:1999 | 05 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $10,689 | $0 | Implemented |
UD0564 # 06 Y:1999 | 06 | 1999 | METER WASTE WATER | $5,686 | $2,200 | Not Implemented |
UD0564 # 07 Y:1999 | 07 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,767 | $3,375 | Implemented |
UD0564 # 08 Y:1999 | 08 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,156 | $5,096 | Not Implemented |
UD0564 # 09 Y:1999 | 09 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $218 | $684 | Not Implemented |
UD0563 # 01 Y:1999 | 01 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $29,762 | $4,400 | Not Implemented |
UD0563 # 02 Y:1999 | 02 | 1999 | ELIMINATE/REDUCE AN OPERATION | $30,000 | $6,648 | Not Implemented |
UD0563 # 03 Y:1999 | 03 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $26,365 | $31,000 | Implemented |
UD0563 # 04 Y:1999 | 04 | 1999 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,536 | $3,000 | Not Implemented |
UD0563 # 05 Y:1999 | 05 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $17,707 | $550 | Not Implemented |
UD0563 # 06 Y:1999 | 06 | 1999 | USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) | $13,484 | $2,645 | Not Implemented |
UD0563 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,212 | $9,270 | Implemented |
UD0563 # 08 Y:1999 | 08 | 1999 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,880 | $8,471 | Not Implemented |
UD0562 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,767 | $10,000 | Not Implemented |
UD0562 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $10,130 | $0 | Implemented |
UD0562 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,200 | $4,000 | Not Implemented |
UD0562 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,677 | $1,040 | Implemented |
UD0562 # 05 Y:1999 | 05 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $5,340 | $4,000 | Not Implemented |
UD0562 # 06 Y:1999 | 06 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,976 | $13,500 | Not Implemented |
UD0562 # 07 Y:1999 | 07 | 1999 | RECYCLE CLEANING SOLVENT AND REUSE | $2,344 | $4,000 | Not Implemented |
UD0562 # 08 Y:1999 | 08 | 1999 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $2,041 | $3,000 | Not Implemented |
UD0561 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $100,000 | $200,000 | Not Implemented |
UD0561 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $12,265 | $5,000 | Not Implemented |
UD0561 # 03 Y:1999 | 03 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,566 | $8,140 | Implemented |