IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,589

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0547 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $43,010 $24,670 Not Implemented
MA0547 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,463 $78,000 Not Implemented
MA0547 # 05 Y:2004 05 2004 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $14,711 $44,000 Not Implemented
MA0547 # 06 Y:2004 06 2004 INSTALL TIMERS AND/OR THERMOSTATS $14,705 $4,020 Not Implemented
MA0547 # 07 Y:2004 07 2004 USE MINIMUM STEAM OPERATING PRESSURE $13,419 $0 Not Implemented
MA0547 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,117 $6,600 Not Implemented
MA0547 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,321 $10,950 Not Implemented
MA0547 # 10 Y:2004 10 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,829 $7,475 Not Implemented
MA0547 # 11 Y:2004 11 2004 ADD AREA LIGHTING SWITCHES $1,964 $2,400 Not Implemented
MA0547 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $825 Not Implemented
MA0547 # 13 Y:2004 13 2004 RECOVER WASTE HEAT FROM EQUIPMENT $349 $1,400 Not Implemented
MA0539 # 01 Y:2003 01 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $13,787 $12,870 Not Implemented
MA0539 # 02 Y:2003 02 2003 INSTALL TIMERS AND/OR THERMOSTATS $5,957 $650 Implemented
MA0539 # 03 Y:2003 03 2003 REDUCE VENTILATION AIR $301 $800 Implemented
MA0539 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $183 $0 Implemented
MA0539 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $63 $93 Not Implemented
MA0537 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $94,545 $112,240 Not Implemented
MA0537 # 02 Y:2003 02 2003 ADOPT IN-HOUSE MATERIAL GENERATION $61,752 $240,000 Not Implemented
MA0537 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,180 $8,000 Not Implemented
MA0537 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,446 $10,396 Implemented
MA0537 # 05 Y:2003 05 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,043 $3,500 Not Implemented
MA0537 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $464 $150 Implemented
MA0537 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $154 $0 Implemented
MA0536 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $112,689 $118,000 Implemented
MA0536 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $91,341 $30,000 Implemented