Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0940 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,509 | $14,500 | Not Implemented |
OK0940 # 06 Y:2016 | 06 | 2016 | INSTALL SET-BACK TIMERS | $1,433 | $1,280 | Implemented |
OK0940 # 07 Y:2016 | 07 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,268 | $4,752 | Not Implemented |
OK0940 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $5,900 | $38,500 | Not Implemented |
OK0940 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,700 | $1,000 | Implemented |
OK0938 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $34,651 | $40,660 | Not Implemented |
OK0938 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,405 | $59,664 | Implemented |
OK0938 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,558 | $4,930 | Not Implemented |
OK0938 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,124 | $3,000 | Not Implemented |
OK0938 # 05 Y:2016 | 05 | 2016 | INSTALL SET-BACK TIMERS | $317 | $344 | Implemented |
OK0938 # 06 Y:2016 | 06 | 2016 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $5,044 | $44,525 | Not Implemented |
OK0938 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $4,491 | $2,935 | Not Implemented |
OK0938 # 08 Y:2016 | 08 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,294 | $5,000 | Not Implemented |
OK0938 # 09 Y:2016 | 09 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,693 | $3,236 | Implemented |
OK0938 # 10 Y:2016 | 10 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $372,611 | $70,000 | Not Implemented |
OK0938 # 11 Y:2016 | 11 | 2016 | OPTIMIZE PLANT POWER FACTOR | $26,300 | $47,542 | Implemented |
OK0938 # 12 Y:2016 | 12 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,836 | $1,371,615 | Not Implemented |
OK0937 # 01 Y:2016 | 01 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,095 | $1,646 | Not Implemented |
OK0937 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,667 | $5,324 | Implemented |
OK0937 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,346 | $88,560 | Implemented |
OK0937 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,363 | $15,376 | Not Implemented |
OK0937 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,445 | $12,000 | Implemented |
OK0937 # 06 Y:2016 | 06 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,197 | $2,060 | Not Implemented |
OK0937 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $74,720 | $594,190 | Not Implemented |
OK0937 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $9,089 | $6,160 | Not Implemented |