IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0401 # 13 Y:2010 13 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,239 $1,000 Implemented
WV0401 # 14 Y:2010 14 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $536 $52 Implemented
NC0398 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $35,525 $20,000 Implemented
NC0398 # 02 Y:2010 02 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $68,552 $57,900 Not Implemented
NC0398 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $9,565 $18,450 Not Implemented
NC0398 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,697 $200 Implemented
NC0398 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,751 $14,000 Not Implemented
NC0398 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $1,205 Implemented
NC0398 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93,642 $225,498 Implemented
NC0397 # 01 Y:2010 01 2010 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $12,960 $17,280 Not Implemented
NC0397 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $712 $1,000 Not Implemented
NC0397 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $1,212 $3,660 Not Implemented
NC0397 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $492 $751 Not Implemented
NC0397 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,804 $12,206 Implemented
NC0397 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $399 $100 Implemented
NC0394 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $22,190 $6,149 Not Implemented
NC0394 # 02 Y:2009 02 2009 DEVELOP A REPAIR/REPLACE POLICY $5,639 $7,629 Not Implemented
NC0394 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,706 $19,737 Not Implemented
NC0394 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,909 $6,600 Not Implemented
NC0394 # 05 Y:2009 05 2009 RECOVER AND REUSE COOLING WATER $4,517 $3,850 Not Implemented
NC0393 # 01 Y:2009 01 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,824 $74,000 Not Implemented
NC0393 # 02 Y:2009 02 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,650 $1,000 Implemented
NC0393 # 03 Y:2009 03 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,020 $2,216 Implemented
NC0393 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $256 $100 Implemented
NC0393 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $967 $2,795 Implemented