IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0469 # 04 Y:2000 04 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,400 $12,780 Implemented
MA0469 # 05 Y:2000 05 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $696 $1,495 Not Implemented
MA0469 # 06 Y:2000 06 2000 USE WATER-BASED DEVELOPERS AND FINISHERS $527 $960 Implemented
MA0469 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $750 Implemented
KU0550 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,989 $17,000 Not Implemented
KU0550 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $650 Not Implemented
KU0550 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,038 $20 Not Implemented
KU0550 # 04 Y:2000 04 2000 AUTOMATE FINISHING PROCESS $101,920 $34,000 Not Implemented
KU0550 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,768 $5,000 Not Implemented
AS0288 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,163 $2,397 Implemented
AS0288 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $1,130 Implemented
AS0288 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,416 $3,589 Implemented
AS0288 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $488 $1,275 Not Implemented
AS0288 # 05 Y:2000 05 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,129 $11,400 Implemented
AS0288 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,100 $11,396 Not Implemented
AS0288 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,959 $0 Not Implemented
AS0288 # 08 Y:2000 08 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $668 $120 Not Implemented
AS0288 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,700 $60 Not Implemented
AS0288 # 10 Y:2000 10 2000 IMPROVE SPACE COMFORT CONDITIONING $4,649 $12,600 Not Implemented
OR0376 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $17,792 $24,000 n/a
OR0376 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,330 $44,000 n/a
OR0376 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,246 $6,825 n/a
OR0376 # 04 Y:2000 04 2000 USE PHOTOCELL CONTROLS $986 $700 n/a
OR0377 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,486 $0 Not Implemented
OR0377 # 02 Y:2000 02 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,345,966 $600,000 Not Implemented