Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0417 # 06 Y:2010 | 06 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $2,928 | $1,000 | Not Implemented |
NC0417 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $168 | $199 | Not Implemented |
NC0417 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $2,865 | $2,751 | Not Implemented |
NC0417 # 09 Y:2010 | 09 | 2010 | USE PHOTOCELL CONTROLS | $417 | $122 | Not Implemented |
UF0436 # 01 Y:2010 | 01 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $493 | $388 | Implemented |
UF0436 # 02 Y:2010 | 02 | 2010 | INSTALL TURBULATORS | $4,953 | $7,500 | Not Implemented |
UF0436 # 03 Y:2010 | 03 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,623 | $20,280 | Not Implemented |
UF0436 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $13,947 | $350 | Implemented |
UF0436 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,376 | $1,782 | Implemented |
UF0436 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $1,758 | $524 | Not Implemented |
UF0436 # 07 Y:2010 | 07 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $811 | $895 | Implemented |
UF0436 # 08 Y:2010 | 08 | 2010 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $19,232 | $26,795 | Implemented |
UF0436 # 09 Y:2010 | 09 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $29,576 | $10,400 | Not Implemented |
AM0582 # 01 Y:2010 | 01 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $404,300 | $3,000 | Implemented |
AM0582 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $147,000 | $5,600 | Implemented |
AM0582 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $116,300 | $220,000 | Implemented |
AM0582 # 04 Y:2010 | 04 | 2010 | Hire Energy Manager | $97,900 | $0 | Not Implemented |
AM0582 # 05 Y:2010 | 05 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $64,500 | $50,000 | Not Implemented |
AM0582 # 06 Y:2010 | 06 | 2010 | INSTALL SUB-METERING EQUIPMENT | $48,000 | $5,000 | Implemented |
AM0582 # 07 Y:2010 | 07 | 2010 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $33,670 | $2,400 | Not Implemented |
AM0582 # 08 Y:2010 | 08 | 2010 | OPTIMIZE PLANT POWER FACTOR | $27,950 | $0 | Not Implemented |
AM0582 # 09 Y:2010 | 09 | 2010 | INSTALL SKYLIGHTS | $15,400 | $14,200 | Not Implemented |
AM0582 # 10 Y:2010 | 10 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,400 | $2,000 | Implemented |
AM0582 # 11 Y:2010 | 11 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,120 | $430 | Not Implemented |
AM0582 # 12 Y:2010 | 12 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,540 | $130 | Implemented |