IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159,016

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0523 # 08 Y:2022 08 2022 REDUCE VENTILATION AIR $346 $1,265 Not Implemented
SU0523 # 09 Y:2022 09 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $8,763 $47,904 Not Implemented
LE0536 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,791 $0 Implemented
LE0536 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,036 $2,440 Implemented
LE0536 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,974 $35,815 Implemented
LE0536 # 04 Y:2023 04 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $28,034 $80,000 Not Implemented
LE0536 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,556 $15,000 Not Implemented
LE0536 # 06 Y:2023 06 2023 ELIMINATE A BY-PRODUCT $188,025 $700,000 Not Implemented
LE0536 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,147 $200,000 Not Implemented
UA0262 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,023 $44,464 Implemented
UA0262 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,699 $2,060 Implemented
UA0262 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,104 $4,929 Implemented
UA0262 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,910 $400 Not Implemented
MA0845 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $108,785 $906,122 Not Implemented
MA0845 # 02 Y:2022 02 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $26,668 $60,000 Implemented
MA0845 # 03 Y:2022 03 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,709 $182,139 Not Implemented
MA0845 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,754 $14,292 Implemented
MA0845 # 05 Y:2022 05 2022 ADJUST VENTS TO MINIMIZE ENERGY USE $8,349 $10,667 Not Implemented
MA0845 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $6,066 $2,910 Not Implemented
MA0845 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,762 $505 Not Implemented
ORC005 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,739 $21,350 Not Implemented
ORC005 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,887 $2,000 Not Implemented
ORC005 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,949 $15,000 Not Implemented
CM1006 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $30,400 $894,000 Not Implemented
CM1006 # 02 Y:2022 02 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $2,098 $10,625 Not Implemented