Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0550 # 03 Y:1998 | 03 | 1998 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $26,700 | $40,000 | Implemented |
UD0549 # 01 Y:1998 | 01 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $322,350 | $250,000 | Not Implemented |
UD0549 # 02 Y:1998 | 02 | 1998 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $12,682 | $0 | Implemented |
UD0549 # 03 Y:1998 | 03 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $3,343 | $1,000 | Not Implemented |
UD0549 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,070 | $3,903 | Not Implemented |
UD0549 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $736 | $0 | Implemented |
UD0549 # 06 Y:1998 | 06 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $624 | $500 | Implemented |
UD0549 # 07 Y:1998 | 07 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $204 | $250 | Not Implemented |
UD0548 # 02 Y:1998 | 02 | 1998 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $7,607 | $720 | Implemented |
UD0548 # 03 Y:1998 | 03 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,274 | $300 | Not Implemented |
UD0548 # 04 Y:1998 | 04 | 1998 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,375 | $1,120 | Implemented |
UD0548 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $781 | $2,000 | Not Implemented |
UD0548 # 01 Y:1998 | 01 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $2,243 | $0 | Implemented |
UD0547 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $228,030 | $30,000 | Implemented |
UD0547 # 02 Y:1998 | 02 | 1998 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $143,713 | $70,000 | Not Implemented |
UD0547 # 03 Y:1998 | 03 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $181,440 | $75,000 | Implemented |
UD0547 # 04 Y:1998 | 04 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $19,335 | $28,000 | Implemented |
UD0547 # 05 Y:1998 | 05 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $7,988 | $11,200 | Not Implemented |
UD0547 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,918 | $0 | Implemented |
UD0547 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,126 | $57,752 | Implemented |
UD0547 # 08 Y:1998 | 08 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,849 | $500 | Implemented |
UD0546 # 01 Y:1998 | 01 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,349 | $0 | Implemented |
UD0546 # 02 Y:1998 | 02 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,580 | $0 | Implemented |
UD0546 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,450 | $6,900 | Not Implemented |
UD0546 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,403 | $4,000 | Implemented |