Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0534 # 08 Y:1997 | 08 | 1997 | USE OTHER WASTE CONCENTRATION METHODS | $2,932 | $500 | Not Implemented |
UD0532 # 01 Y:1997 | 01 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,469 | $0 | Implemented |
UD0532 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,083 | $15,018 | Implemented |
UD0532 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,422 | $637 | Not Implemented |
UD0532 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $123 | $2,000 | Implemented |
UD0532 # 05 Y:1997 | 05 | 1997 | USE OTHER WASTE CONCENTRATION METHODS | $580 | $0 | Implemented |
UD0532 # 06 Y:1997 | 06 | 1997 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $6,335 | $5,000 | Implemented |
UD0532 # 07 Y:1997 | 07 | 1997 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $10,100 | $20,000 | Not Implemented |
UD0532 # 08 Y:1997 | 08 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $2,508 | $4,880 | Implemented |
UD0533 # 01 Y:1997 | 01 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $508 | $0 | Implemented |
UD0533 # 02 Y:1997 | 02 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,468 | $200 | Implemented |
UD0533 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,455 | $2,564 | Implemented |
UD0533 # 04 Y:1997 | 04 | 1997 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $352 | $50 | Implemented |
UD0533 # 05 Y:1997 | 05 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $553 | $750 | Implemented |
UD0533 # 06 Y:1997 | 06 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,574 | $20,000 | Not Implemented |
UD0533 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,000 | $36,000 | Implemented |
UD0533 # 08 Y:1997 | 08 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $101 | $50 | Implemented |
UD0533 # 09 Y:1997 | 09 | 1997 | MINIMIZE WATER USAGE | $125 | $60 | Not Implemented |
UD0531 # 01 Y:1997 | 01 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,192 | $300 | Implemented |
UD0531 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $611 | $2,000 | Implemented |
UD0531 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,444 | $12,327 | Implemented |
WV0129 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,294 | $12,594 | Implemented |
WV0129 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,704 | $205 | Not Implemented |
WV0129 # 03 Y:1997 | 03 | 1997 | USE SYNTHETIC LUBRICANT | $1,750 | $375 | Implemented |
WV0129 # 04 Y:1997 | 04 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $550 | $500 | Implemented |