Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0129 # 05 Y:1997 | 05 | 1997 | INSTALL AUTOMATIC STACK DAMPER | $1,848 | $250 | Not Implemented |
WV0129 # 06 Y:1997 | 06 | 1997 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $240 | $1,475 | Not Implemented |
WV0129 # 07 Y:1997 | 07 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $53 | $44 | Implemented |
WV0129 # 08 Y:1997 | 08 | 1997 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $60,000 | $200 | Not Implemented |
WV0129 # 09 Y:1997 | 09 | 1997 | RECOVER AND REUSE COOLING WATER | $5,824 | $2,300 | Implemented |
WV0129 # 10 Y:1997 | 10 | 1997 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $420,000 | $35,000 | Not Implemented |
WV0128 # 01 Y:1997 | 01 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $892 | $150 | Not Implemented |
WV0128 # 02 Y:1997 | 02 | 1997 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,725 | $550 | Not Implemented |
WV0128 # 03 Y:1997 | 03 | 1997 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,800 | $4,700 | Not Implemented |
WV0128 # 04 Y:1997 | 04 | 1997 | INSULATE BARE EQUIPMENT | $9,736 | $713 | Not Implemented |
WV0128 # 05 Y:1997 | 05 | 1997 | INSULATE BARE EQUIPMENT | $109 | $33 | Not Implemented |
WV0128 # 06 Y:1997 | 06 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,400 | $6,300 | Not Implemented |
WV0128 # 07 Y:1997 | 07 | 1997 | RECOVER AND REUSE COOLING WATER | $2,540 | $9,300 | Not Implemented |
WV0128 # 08 Y:1997 | 08 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $202,500 | $250,000 | Not Implemented |
UD0530 # 01 Y:1997 | 01 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,055 | $2,200 | Not Implemented |
UD0530 # 02 Y:1997 | 02 | 1997 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,250 | $5,600 | Implemented |
UD0530 # 03 Y:1997 | 03 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,540 | $37,500 | Not Implemented |
UD0530 # 04 Y:1997 | 04 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $24,402 | $0 | Implemented |
UD0530 # 05 Y:1997 | 05 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $51,015 | $200,000 | Not Implemented |
UD0530 # 06 Y:1997 | 06 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,833 | $66,000 | Not Implemented |
UD0528 # 01 Y:1997 | 01 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $4,108 | $0 | Implemented |
UD0528 # 02 Y:1997 | 02 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,857 | $10,000 | Implemented |
UD0528 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,076 | $5,818 | Implemented |
UD0528 # 04 Y:1997 | 04 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,886 | $200 | Implemented |
UD0528 # 05 Y:1997 | 05 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,859 | $11,000 | Not Implemented |