Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
244
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0448 # 05 Y:2011 | 05 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,034 | $1,627 | Not Implemented |
UF0448 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $3,138 | $1,469 | Not Implemented |
UF0448 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $3,518 | $2,040 | Implemented |
UF0448 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,397 | $9,355 | Implemented |
UF0448 # 09 Y:2011 | 09 | 2011 | USE COMPRESSOR AIR FILTERS | $7,367 | $1,634 | Not Implemented |
UF0448 # 10 Y:2011 | 10 | 2011 | INSULATE BARE EQUIPMENT | $5,708 | $4,205 | Not Implemented |
UF0448 # 11 Y:2011 | 11 | 2011 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $291 | $1,730 | Not Implemented |
UF0448 # 12 Y:2011 | 12 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $515,044 | $294,885 | Not Implemented |
MI0211 # 01 Y:2011 | 01 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $25,532 | $213,119 | Implemented |
MI0211 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,191 | $41,400 | Implemented |
MI0211 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,390 | $25,000 | Not Implemented |
MI0211 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,111 | $1,320 | Implemented |
MI0211 # 05 Y:2011 | 05 | 2011 | HEAT WATER WITH EXHAUST HEAT | $16,479 | $30,000 | Not Implemented |
MI0211 # 06 Y:2011 | 06 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,771 | $1,950 | Implemented |
MI0211 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,618 | $50 | Implemented |
MI0211 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,475 | $1,720 | Not Implemented |
MI0211 # 09 Y:2011 | 09 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,438 | $4,571 | Implemented |
UF0447 # 01 Y:2011 | 01 | 2011 | INSULATE BARE EQUIPMENT | $12,701 | $6,982 | Not Implemented |
UF0447 # 04 Y:2011 | 04 | 2011 | USE PHOTOCELL CONTROLS | $439 | $147 | Not Implemented |
UF0447 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,286 | $680 | Not Implemented |
UF0447 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,428 | $19,015 | Not Implemented |
UF0447 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,042 | $0 | Not Implemented |
UF0447 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $125 | $120 | Not Implemented |
UF0447 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,292 | $12,615 | Not Implemented |
UF0447 # 02 Y:2011 | 02 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $455 | $985 | Not Implemented |