IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,615

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0565 # 04 Y:2004 04 2004 REPLACE BOILER $2,760 $750 Implemented
MA0565 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,088 $8,000 Not Implemented
MA0565 # 02 Y:2004 02 2004 $57,540 $40,000 Implemented
MA0565 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $216,000 $125,000 Implemented
MA0564 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $548 Implemented
MA0564 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $168 $75 Not Implemented
MA0564 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,406 $3,226 Not Implemented
MA0564 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,419 $10,531 Not Implemented
MA0564 # 01 Y:2004 01 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $20,000 $0 Not Implemented
MA0563 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,550 $12,000 Implemented
MA0563 # 02 Y:2004 02 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,769 $650 Implemented
MA0563 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $257 $155 Not Implemented
MA0563 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $116 $0 Implemented
MA0500 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $47,575 $350,000 Not Implemented
MA0500 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,719 $45,000 Not Implemented
MA0500 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,719 $20,000 Not Implemented
MA0500 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $14,725 $35,000 Implemented
MA0500 # 05 Y:2001 05 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,562 $18,000 Not Implemented
MA0500 # 06 Y:2001 06 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,262 $10,000 Not Implemented
MA0500 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,051 $12,900 Not Implemented
MA0500 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,264 $2,000 Implemented
MA0500 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,225 $5,950 Not Implemented
ME0305 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $366 $357 Implemented
ME0305 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $15,000 $41,800 Implemented
ME0305 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $325 $225 Implemented