IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,707

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0198 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $19,115 $49,375 Not Implemented
NL0073 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $772 $58 Implemented
NL0073 # 04 Y:2022 04 2022 USE OTHER WASTE CONCENTRATION METHODS $1,144 $1,258 Implemented
NL0073 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,239 $1,398 Not Implemented
NL0073 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,537 $35,000 Implemented
NL0073 # 01 Y:2022 01 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,217 $225,000 Implemented
IC0251 # 03 Y:2021 03 2021 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $4,596 $2,567 Not Implemented
IC0251 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,466 $1,457 Not Implemented
IC0251 # 01 Y:2021 01 2021 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $83,331 $171,790 Not Implemented
IA0541 # 05 Y:2015 05 2015 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,909 $1,547 Not Implemented
IA0541 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,920 $20,600 Not Implemented
IA0541 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,167 $470 Not Implemented
IA0541 # 03 Y:2015 03 2015 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,245 $6,960 Not Implemented
IA0541 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $4,110 $5,543 Not Implemented
IA0541 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,690 $4,712 Implemented
IA0541 # 08 Y:2015 08 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,121 $175 Not Implemented
IA0541 # 09 Y:2015 09 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $602 $280 Implemented
IA0541 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $980 Implemented
IA0541 # 11 Y:2015 11 2015 DIRECT WARMEST AIR TO COMBUSTION INTAKE $328 $212 Not Implemented
IA0541 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,686 $214 Implemented
IA0540 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,905 $15,307 Not Implemented
IA0540 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,814 $7,338 Not Implemented
IA0540 # 04 Y:2015 04 2015 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,054 $15,000 Not Implemented
IA0540 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,824 $22,377 Not Implemented
IA0540 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $24,230 $58,000 Not Implemented